| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC | ₹19.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.7 LRejected-AOC | ₹19.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Saran Construction L2 | TAMILSELVI L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling of existing Reinforced cement concrete including all labour and materials charges etc., complete | 4 | Cum | 4,611 ₹18,444 | 4,610 ₹18,440 Lowest |
| 2.00 | Dismantling of existing Plain Cement Concrete including all labour and materials charges etc., complete | 75 | Cum | 521 ₹39,075 | 520 ₹39,000 Lowest |
| 3.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 67 | Cum | 112 ₹7,504 | 111 ₹7,437 Lowest |
| 4.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 43 | Cum | 286 ₹12,298 | 285 ₹12,255 Lowest |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 42.5 | Cum | 5,561 ₹2,36,342.5 Lowest | 5,562 ₹2,36,385 |
| 6.00 | Supply and erecting centering for sides and soffits including supports and strutting up to 3.29. High for plane surface such as RCC slabs Rectangular beams Tee (or) Ell beams lintels Bed Block, slabs, landing beam canopy side lab, or bnoxing vertical slabs, rectangular(or)sqyuare(or) coloums etc., Sheets of size with all cross branching using M.S Sheets of size 90cmx60cm and B.G 10 stidfned wih welded M,.S angle of size 25mmx25mmx3mm for boarding laid over silver oak joists of size 10cmx6.5cm, spaced at about 90cm centre to and suported by csuarnia proposal centre to centre and supoported by causarnia 10cm to 13cm dia spaced 75cm centre to centreing complete complying with standard specification. | 788 | Sqm | 687 ₹5,41,356 | 686 ₹5,40,568 Lowest |
| 7.00 | Cement concrte 1:2:4 mix ( one cement, two sand and four aggregate ) including the cost and conveyance of all materials and excluding the cost of steel and including the labour charges for mixing, laying of concrete and curing etc complete as per the standard specifications. | 105.5 | Cum | 6,841 ₹7,21,725.5 | 6,839 ₹7,21,514.5 Lowest |
| 8.00 | Supply and delivery of 38mm to 40mm thick cuddappa slab.incuding conveyance and all cost of materials, labours, etc.complete as per standard specification. | 17 | Sqm | 480 ₹8,160 | 479 ₹8,143 Lowest |
| 9.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 5 | Cum | 8,364 ₹41,820 | 8,362 ₹41,810 Lowest |
| 10.00 | Supplying and fabricating and placing in position of MS or RTS rods including cutting bending cranking and tying grills in position etc. complete as per standard specifications. | 500 | Kg | 94 ₹47,000 | 92.5 ₹46,250 Lowest |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
7 Nov 2025, 3:00 pmClosed
COMMISSIONER VILLUPURAM MUNICIPALITY
VILLUPURAM MUNICIPALITY
Construction of Storm water drain and culvert at Razak layout 2nd 5th street in ward no 7. villupuram municipality
2025_MAWS_618382_12
3429/2025/E3
Open Tender
Civil Works
Works
30 days
Villupuram Municipality
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹20,000
11 Aug 2026
29 Oct 2025
7 Nov 2025
29 Oct 2025
7 Nov 2025
29 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.04 MB
BOQ
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].