Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-Finance H NO 58 ARLEM RAIA SALCETE GOA | SOUTH GOA | GOA | 403103 | ₹8.3 L | L1 | Accepted-Finance L1 Accepted |
| 2 | L2₹8.9 L+₹60,695.89 (7.29%)Rejected-Finance GOA | SOUTH GOA | GOA | 403802 | ₹8.9 L+₹60,695.89 (7.29%) | L2 | Rejected-Finance L2 Rejected |
| 3 | L3₹9.0 L+₹69,366.74 (8.33%)Rejected-Finance | ₹9.0 L+₹69,366.74 (8.33%) | L3 | Rejected-Finance L3 Rejected |
Tender Value
₹8.7 L
EMD Value
₹17,342
Closing Date
13 Aug 2026, 4:00 pmClosed
Assistant Director of Agriculture (Hort)
Krishi bhavan Directorate of Agriculture Tonca Caranzalem Goa
Renovation of spring in Madkai Village of Ponda Taluka in Survey No.398/2
2026_DAG_30867_1
33HotCSSPMKSYWDC62627DAgr56245
Open Tender
Civil Works
Percentage
Assistant Director of Agriculture (Hort), Director
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹17,342
31 Aug 2026
5 Aug 2026
14 Aug 2026
6 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation over areas in saturated soil (exceeding 0.30 m depth up to a depth of 0.60 m) including disposal of excavated earth, upto a lift of 1.5 m & within a lead of 50m to be neatly dressed levelled, as directed by the Departmental Officer a) excluding planking, timbering in trenches and dewatering. | 72 | Cu.m | 806 | ₹58,032 |
| 2 | Dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing diesel generated pump | 72 | Cu.m | 498 | ₹35,856 |
| 3 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 50.4 | Cu.m | 245 | ₹12,348 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 14.4 | Cu.m | 2,211 | ₹31,838.4 |
| 5 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 9.6 | Cu.m | 6,325 | ₹60,720 |
| 6 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing :a)All works upto plinth level | 32.76 | kg | 6,635 | ₹2,17,362.6 |
| 7 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) In retaining walls , return walls(any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 34.2 | cu.m | 7,429 | ₹2,54,071.8 |
| 8 | Centering & shuttering including Strutting, Propping & removal of forms for : a) Vertical surfaces such as retaining walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 225.6 | Sq.m | 479 | ₹1,08,062.4 |
| 9 | 18mm cement plaster in two coats under layer 12mm thick cement plaster 1:5 ( 1 cement : 5 coarse sand) and top layer 6mm thick with cement plaster 1: 3 (1 cement : 3 coarse sand) finished with sponge. | 225.6 | Sq.m | 329 | ₹74,222.4 |
| 10 | Standard Wood Core FRP (Fiber Reinforced Polymer) Door Shutter with Single Colour including accessories. A) Shutter Thickness : a) 32mm | 1.44 | Sq.m | 3,174 | ₹4,570.56 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.17 MB
BOQ_31268.xls
BOQ • 0.34 MB
Corrigendum.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .