Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.6 LAdmitted-Finance | -17.65% | ₹20.6 L | L1 | Admitted-Finance |
| 2 | L2₹21.0 LAdmitted-Finance | -16.12% | ₹21.0 L | L2 | Admitted-Finance |
Tender Value
₹25.0 L
EMD Value
₹2.5 L
Closing Date
9 Feb 2026, 2:00 pmClosed
Executive Engineer Minor Irrigation Div- prayagraj
Executive Engineer Minor Irrigation Div- prayagraj
Construction of Sadullapur Checkdam Villege- Sadullapur, Purey sukhdev, Block- Mandhata, District- Pratapgarh
2026_UPMID_1109243_1
2013/MI/AC/NividaSuchna/25-26 dt. 22.01.2026
Open Tender
Civil Works
30 days
Construction of Sadullapur Checkdam
Please refer Tender documents.
2 documents required · 2 mandatory
₹900
Executive Engineer Minor irrigation division
₹2.5 L
Yes
14 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
9 Feb 2026
3 Feb 2026
Dewatering work by 10 HP Diesel pump set with operator & P.O.L.
(i lift) Making Diversion drain With o/soil up to 1.50 m. lift & 30m.lead i/all complet.
(ii lift) Making Diversion drain With o/soil up to 1.50 m. to 1.80 m. lift & 30m. lead i/all complet.
(i lift) Earth work excavation in ordinary soil / kanker mixed hard soil I/c Up to 1.50 m. lift and 30 m. lead
(ii lift) Earth work excavation in ordinary soil kanker mixed hard soil I/c Up to 1.50 m. to 1.80 m lift and 30 m. lead
Removal of slush from nala bed before excavation s.soil Up to 2.40 m. to 2.70 m lift and 30 m. lead
Earth work excavation in foundation in mar kabar ordinary & kanker mixed saturated soil crest, wing wall etc. Beyond 1.50 lift and 30 m. lead
P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in foundation.
R.C.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
R.R. Stone masonary work in 1:4 (cement :c/sand) morter i/all the cost of material, labour etc. required for proper complition of the work in superstructure.
P.C.C. Work with 1:2:4 (cement,c/sand & 10-20 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work.
Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work.
Laying of dry stone boulder filling in inverted filter including cost of material, labour etc.
(i) Removal of cofferdam up to 1.50 m. lift.
(ii) Removal of cofferdam Beyond 1.50 m. to 3.00 m lift.
Filling Of Div. Drain
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.67 MB
BOQ_2048333.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid