Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
30 Sept 2023, 3:00 pmClosed
The Superintending Engineer/Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER, TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd FLOOR, KRBS TOWER, 208 / 650, METTUPALAYAM BUS STOP, PERUMANALLUR ROAD, TIRUPUR 641 602, TAMILNADU.
Survey, Supply, Erection, Testing and Commissioning of 11 KV Three Phase Aerial Bunched XLPE Insulated Aluminium Cable with accessories in 11 KV Kumaranandapuram Feeder of 110/11 KV Kumar Nagar SS in Town North Section
2023_EB_370542_1
Spec.No.WOT-32/2023-24 Dt.14.09.2023
Open Tender
Electrical Works
Works
180 days
Town North Tirupur Section
2 documents required · 2 mandatory
₹0
₹14,000
Yes
7 Nov 2023
15 Sept 2023
3 Oct 2023
15 Sept 2023
30 Sept 2023
15 Sept 2023
15 Sept 2023 - 30 Sept 2023
Supply of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Supply of Cable Straight Through Joint Kit suitable for 95 sq. mm
Supply of T Jointing Kit
Supply of End Termination Kit
Supply of Suspension Clamp Assembly including Pole Clamps
Supply of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Supply of End Caps
Supply of Spiral Earth Electrodes
Supply of Grounding Connection for Messenger Wire
Supply of Anchor Sleeve for Messenger Wire
Labour Charges for Erection of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm
Labour Charges for Erection of Cable Straight Through Joint Kit suitable for 95 sq. mm
Labour Charges for Erection of T Jointing Kit
Labour Charges for Erection of End Termination Kit
Labour Charges for Erection of Suspension Clamp Assembly including Pole Clamps
Labour Charges for Erection of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps
Labour Charges for Erection of End Caps
Labour Charges for Erection of Spiral Earth Electrodes
Labour Charges for Erection of Grounding Connection for Messenger Wire
Labour Charges for Erection of Anchor Sleeve for Messenger Wire
Excavation & backfilling of pole pit for pole above 8.00 m length by using JCB / manual
Erection of RCC, REC, PSC pole above 8.00 m length by using crane / manual
Erection of metal support above 9 m / RSJ / rail pole / tubular pole
Earthing of pole with GI wires 4 or 6 SWG by coil earthing
Excavation & backfilling of stay pit of 4.5 to 5 feet depth using JCB / Manual
Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.
Fixing of HT LAS (3 Nos.)
Fixing of V cross arm 3.5 feet
Fixing of HT / LT TI fitting
Dismantling of RCC, REC, PSC & metal pole of all sizes including the closing of the pit
Labour Charges for Testing & Commissioning of Complete Line
SUB TOTAL (Items 1 to 31)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .