Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹85.7 LAccepted-Finance 120 144 III PHASE APNA VIHAR JAMMU J K | JAMMU | JAMMU | JAMMU AND KASHMIR | 180010 | L1 | Accepted-Finance Lowest bidder | |
| 2 | L2₹86.0 L+₹33,534 (0.39%)Accepted-Finance | L2 | Accepted-Finance Other than lowest bidder | |
| 3 | L3₹88.0 L+₹2.3 L (2.67%)Accepted-Finance 236 PRABHU NIWAS DALHOUSIE ROAD NEAR KALU KA PUMP PATHAKNOT PUNJAB 145001 | PATHANKOT | PUNJAB | 145001 | L3 | Accepted-Finance Other than lowest bidder | |
| 4 | L4₹89.8 L+₹4.1 L (4.78%)Accepted-Finance NEAR MES FILTER PLANT SANGOOR UDHAMPUR J K 182101 | UDHAMPUR | UDHAMPUR | J K | 182101 | L4 | Accepted-Finance Other than lowest bidder | |
| 5 | L5₹93.9 L+₹8.3 L (9.63%)Accepted-Finance | L5 | Accepted-Finance Other than lowest bidder |
Tender Value
₹96.2 L
EMD Value
₹1.7 L
Closing Date
29 Dec 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE Jammu
HQ CWE Jammu Pin 900172 C/o 56 APO
PROVN OF ENERGY EFFICIENT LIGHTING SYSTEM AND PREPAID METERS IN JAMMU CANTT UNDER GE SATWARI
2021_MES_487776_1
CWE/JP-61/2021-22
Open Tender
Support/Maintenance Service
Item Rate
240 days
AOR GE Satwari
Class C, Cat b (i)
9 documents required · 9 mandatory
₹1,000
G E Satwari
₹1.7 L
26 Feb 2022
11 Nov 2021
5 Jan 2022
11 Nov 2021
29 Dec 2021
22 Dec 2021
90 days
Amount
Taking down existing energy meters by disconnecting existing electric connection from Meter board, keeping in MES Store Yard safely & connecting the existing electric connection with main distribution board properly and complete, all as specified and directed by Engr-In-Charge.
Supply , Installation, testing and commissioning of Smart Three Phase Electric Meter with the following specifications: AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444:2015 (Reaffirmed 2020) and relevant IEC standards with inbuilt 4G/2G Cellular communication with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuits. Meter should support the following datas :- 30 minutes instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand. Meter should have connect / disconnect functionality operable from prepaid billing software. The meter should support open communication protocol DLMS/NBIOT with the software +B7 and include one polycarbonate box complete all as specified and directed by Engr-in-charge. Contd to Srl Item No 2.01
Notes:- (a) It would be possible to run the meters in both prepaid and postpaid modes. (b) The meters would carry 5 years warranty.
Supply , Installation, testing and commissioning of Smart Three Phase Electric Meter with the following specifications :- AC Three Phase Four Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444 : 2015 (Reaffirmed 2020) and relevant IEC standards with Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuits. Meter Should support the following datas : 30 minutes instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand. Meter should have connect / disconnect functionality operable from prepaid billing software. The meter should support open communication protocol DLMS with the software and include one polycarbonate box complete all as specified and directed by Engr-in-charge . Contd to Srl Item No 3.01
Notes:- (a) It would be possible to run the meters in both prepaid and postpaid modes. (b) The meters would carry 5 years warranty.
Supply , Installation, testing and commissioning of Smart Single Phase Electric Meter with the following specifications:- AC Single Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444:2015 (Reaffirmed 2020) and relevant IEC standards with Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitrs. Meter Should support the following datas : 30 minutes instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand. Meter should have connect / disconnect functionality operable from prepaid billing software. The meter should support open communication protocol DLMS with the software and include one polycarbonate box complete all as specified and directed by Engr-in-charge. Contd to Srl Item No 4.01
Notes:- (a) It would be possible to run the meters in both prepaid and postpaid modes. (b) The meters would carry 5 years warranty.
Supply , Installation, testing and commissioning of IP-67 protection Gateway compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It would have internal memory to store datas of at least 200 modules with inbuilt battery back-up for 6 to 12 Hrs, support auto discovery of the meters and self healing mechanism for the breaks in the RF network complete all as specified and directed by Engr-in-charge .
Supply , Installation, testing and commissioning of single phase Electric Meter as repeaters with the following specifications:- AC Single Phase Two Wire, Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-60 A conforming to IS-16444:2015 (Reaffirmed 2020) and relevant IEC standards with Radio Frequency communication facility with self healing Mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitrs. Meter Should support the following datas : 30 minutes instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, 30 load survey data for energy, monthly billing survey for Cumulative Energy and Max Demand. Meter should have connect / disconnect functionality operable from prepaid billing software. The meter should support open communication protocol DLMS with the software and include one polycarbonate box complete all as specified and directed by Engr-in-charge. Contd to Srl Item No 6.01
Notes:- (a) It would be possible to run the meters in both prepaid and postpaid modes. (b) The meters would carry 5 years warranty.
Supply and Configuration of the Web based Software with following modules: (i) Meter Data Management Module The meter data management module would be responsible for collecting the data from the concentrator and make the data available to the billing system. The meter data management system would capture and provide the following data: (a) 30 minutes instantaneous data from all the meters for Seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency (b) Monthly billing survey data for cum energy and max demand Contd to Srl Item No 7.01
(ii) Postpaid /Prepaid Billing Module The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required. (iii) Occupation and Vacation Module The system would support occupation / vacation and billing reports. the software would be collecting data from DCU. The software would provide access to staff as well as the occupant for the data. Contd to Srl Item No 7.02
(iv) Web site: There would be a dedicated website for the GE, AGE and BSO team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use). (v) Customer Portal The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (vi) Energy Accounting Module The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available. Contd to Srl Item No 7.03
(vii) Communication Module The system would provide communication of energy data and bills via print, email and sms methods. (viii) Meter Master Data The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export The system would support export of metering and billing data in excel format. (x) Customer Care Module - the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. Contd to Srl Item No 7.04
(xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. Note:- (a) The software would be hosted on MEITY (Ministry of Electronic and Information Technology) approved GCC (Government Community Cloud). It would be transferred to MES Server whenever the server is made available. (b) The software and system would contain two year defect liability including all operating expenses such as GPRS charges, hosting charges and no additional cost shall be born by the department on this respect. (c) The software should be integrable with other metering system of IS 16444 based on availability of the web services Note: Two years of defect liability period include the following items:- Contd to Srl Item No 7.05
(i) Monthly sim charges for the DCU :-The contractor would ensure supply of appropriate SIMs to ensure necessary signal availability. The contractor would change the sim or sim provider as required. In case of network issues, the contractor would liaison with the telecom service providers for necessary resolution for the entire 2 years defect liability. (ii) Recurring SMS charges:- The SMS would be issued for the payments alerts, low balance alerts and disconnection / connection alerts and no additional cost shall be born by the department on this respect. (iii) Software AMC:-This would include necessary upgradations in the software such as support to the chrome browser changes, android version changes , IOS version changes. These changes happen on frequent basis and the software would support all the changes. Contd to Srl Item No 7.06
(iv) Changes in the government tariff structure. The government tariff structure changes may require software upgrade . The same would be included in the AMC scope of work for 2 year period as mentioned above. (v) Remote server admin support :- Ensuring adequate database back up, upgradations in the operating system, anti virus updates, database upgrade etc. (vi) Reports Development :- The additional reports as needed for the success of the project would be developed (vii) Software installation on any alternate / backup server if required. (viii) The communication network monitoring and support. (ix) Configuration of the repaired / replaced hardware in the system. (x) Trouble shooting and necessary actions to run the system as required. (xi) Software bug fixing as and when required. Contd to Srl Item No 7.07
Special Note:- The contractor shall submit MOU with approved vendor or approved vendor's authorised company for development and backend support of the items mentioned in Sl No - 7 for the entire contract duration and further 2 years backend liability period).
Sub main wiring with Two single core FRLSH PVC insulated unsheathed 1100 volts grade cable with stranded copper conductor of size 6 Sq mm drawing through and including concealed rigid non metallic PVC conduit medium grade ISI marked minimum 20 mm dia including one single core FRLSH PVC insulated unsheathed 1100 volts grade cable with stranded copper conductor of size 6.0 Sqmm as earth continuity conductor connected to commen earth and earth dolly complete all as specified and directed by Engr-in-charge .
Single pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole and neutral MCB 32 Amps, C curve 240 volts complete all as specified and directed.
Bhan Infrastructure Holding and Leasing Company
D.V.Electromatic Pvt.Ltd
FANGALIA TRADERS
Bharat Builder
TRIVENI CONSTRUCTIONS
Rajindera Enterprises
Saini Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .