| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance L2 |
| 3 | L3₹2.1 LRejected-Finance | ₹2.1 L | L3 | Rejected-Finance L3 |
| 4 | L4₹2.2 LRejected-Finance | ₹2.2 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | PALANI R L2 | K S SARVESH BUILDERS L4 | SIVASAKTHIKUMAR L3 | HAJA MOHIDEEN L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT | 0.31 | cum | 6,171 ₹1,913.01 | 430 ₹133.30 | 422 ₹130.82 | 6,170 ₹1,912.70 |
| 2.00 | Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm | 1.62 | sqm | 423 ₹685.26 | 290 ₹469.80 | 285 ₹461.70 | 422 ₹683.64 |
| 3.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm. | 3.39 | sqm | 286 ₹969.54 | 6,180 ₹20,950.20 | 6,170 ₹20,916.30 | 285 ₹966.15 |
| 4.00 | Fabrication and supply of Mild Steel Window of size 0.90 x 1.35 including all labour charges etec complete | 2 | sqm | 5,226 ₹10,452 | 180 ₹360 | 160 ₹320 | 5,225 ₹10,450 |
| 5.00 | Labour charges for fixing window and ventilators along with frames in position etc., complete etc., complete | 2.43 | sqm | 338 ₹821.34 | 5,230 ₹12,708.90 | 5,225 ₹12,696.75 | 337 ₹818.91 |
| 6.00 | Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum. | 94.67 | sqm | 161 ₹15,241.87 | 350 ₹33,134.50 | 337 ₹31,903.79 | 160 ₹15,147.20 |
| 7.00 | Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete | 182.83 | sqm | 212 ₹38,759.96 | 250 ₹45,707.50 | 211 ₹38,577.13 | 211 ₹38,577.13 |
| 8.00 | Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete. | 126.07 | sqm | 269 ₹33,912.83 | 280 ₹35,299.60 | 268 ₹33,786.76 | 268 ₹33,786.76 |
| 9.00 | Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts including all cost and conveyence of all materials and all labour charges etc compe\lete | 25 | sqm | 818 ₹20,450 | 820 ₹20,500 | 817 ₹20,425 | 817 ₹20,425 |
| 10.00 | Wiring with 2x1.5sqmm (22/0.3) Pvc insulated unshealthed sc.cu Conductor of 1100v grade in suitable PVC Rigid pipe on wall and celling with PVC accessories with TW Switch box with 5A F.T Switch inflush with wall covered with hylem sheet of 3mm thick with painting of suitable colour for open PVC light point/Fan point(For electronic Requlator)SD-18 | 6 | nos | 1,664 ₹9,984 | 1,700 ₹10,200 | 1,663 ₹9,978 | 1,663 ₹9,978 |
Tender Value
₹2.3 L
EMD Value
₹2,320
Closing Date
26 Feb 2026, 3:00 pmClosed
Block Development officer
Block Development office Tenkasi
Repair and Rennovation of Anganwadi building in Alagappapuram village in kuthukalvalsai Panchayat.in Tenkasi Panchayat Union at Tenkasi District under RBMS-2025-26
2026_RDTN_662368_5
BDOBLK/462/2025-A2 DATE 18.02.2026
Open Tender
Civil Works
TENKASI
REFER TENDER NOTICE
3 documents required · 3 mandatory
₹0
₹2,320
18 Mar 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete For 100CFT
Supplying & fixing with cuddapah slabs 20-30mm thick for cup board thick and pointed with cement mortar 1:3 -10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm.
Fabrication and supply of Mild Steel Window of size 0.90 x 1.35 including all labour charges etec complete
Labour charges for fixing window and ventilators along with frames in position etc., complete etc., complete
Providing granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete for 10 cum.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Roofing with AC corrugated sheet 6mm thick including cost of " J " bolts including all cost and conveyence of all materials and all labour charges etc compe\lete
Wiring with 2x1.5sqmm (22/0.3) Pvc insulated unshealthed sc.cu Conductor of 1100v grade in suitable PVC Rigid pipe on wall and celling with PVC accessories with TW Switch box with 5A F.T Switch inflush with wall covered with hylem sheet of 3mm thick with painting of suitable colour for open PVC light point/Fan point(For electronic Requlator)SD-18
Wiring with 2x1.5sqmm (22/0.3) Pvc insulated unshealthed sc.cu Conductor of 1100v grade in suitable PVC Rigid pipe on wall and celling with PVC accessories with 150mmx100mmx113mm Tw Switch box in flush with wall with 3mm thick hylem sheet cover for 5A3 pin non inter locking CS plug with Painting of sutible colour with continuous earth wire connection of 14 SWG TC wire for open PVC plug point.SD-36
Supply and fixing of single box type 4'40 W flu fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu tube with PVC unsheathed copper leads from the terminals to the fittingd SD-88
Supply and fixing of 1200mm(48inch) AC Celling fan complete with stepped electronic 300 W Requlator with 300mm down rod on the existing clamp SD-110
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
Tendernotice_2.pdf
PDF • 0.89 MB
BOQ_795341.xls
BOQ • 0.27 MB