Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC H NO 53 2 NEAR GOVT PRIMARY SCHOOL DULER MAPUSA BARDEZ GOA | ₹11.4 L | L1 | Accepted-AOC AOC Awarded |
| 2 | L2₹12.9 LRejected-Finance 2128 DESAI NAGAR SANKHALI GOA | NORTH GOA | GOA | 403001 | ₹12.9 L | L2 | Rejected-Finance Rejected |
Tender Value
₹12.1 L
EMD Value
₹24,191
Closing Date
19 Jun 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji - Goa
Reconstruction of existing pathway with pavers at 20 point programme house surrounding at Khalap wada Canca and from Sandhya Morajkar house to Santosh palyekar house in ward no. III, in V.P. Verla - Canca in Anjuna Z.P. Constituency. (XVth Finance)
2026_ZP_29737_1
NGZP/02/2026-27/38/218/L17
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,191
6 Aug 2026
12 Jun 2026
22 Jun 2026
12 Jun 2026
19 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 239.75 | Sqm | 330 | ₹79,117.5 |
| 2 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 1 | Cum | 1,122 | ₹1,121.89 |
| 3Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 3.01 | All types of Ordinary rock including all types of laterite rock, blasting prohibited | 50.4 | Cum | 672 | ₹33,868.8 |
| 4 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | - | Cum | 2,211 | - |
| 5Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 5.01 | All works upto plinth level | 74.38 | Cum | 6,635 | ₹4,93,478.13 |
| 6Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 6.01 | Foundations, Footings, Bases for columns | 60 | Sqm | 407 | ₹24,420 |
| 7 | Providing and and laying Ceramic glazed floor tiles 300 x 300 (thickness to be specified by the manufacturer) of 1st quality conforming to IS:15622 of approved make in colours such as white, ivory, grey, fume red, brown laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand) including pointing the joints with white cement and matching pigment etc., complete | 40 | Sqm | 1,016 | ₹40,640 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_30161.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].