Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-Finance R O DHOMKHAR | SOLAPUR | MAHARASHTRA | 413001 | L1 | Accepted-Finance Admitted | |
| 2 | L2₹11.3 L+₹1.7 L (17.4%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹11.6 L+₹2.0 L (20.9%)Accepted-Finance | L3 | Accepted-Finance Admitted | |
| 4 | L4₹11.9 L+₹2.3 L (23.8%)Accepted-Finance | L4 | Accepted-Finance Admitted | |
| 5 | L5₹11.9 L+₹2.3 L (23.8%)Accepted-Finance R O DIGGAR | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | THINLAS DORJAY L1 | STANZIN LOBZANG L2 | M/S MOHD SADIQ GOVT CONTRACTOR L3 | M/S KUNZANG ISHI GOVT CONTRACTOR L4 | TASHI TUNDUP GOVT CONTRACTOR L6 | M/S JIGMET LUNDUP L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm 0n plan)including disposal of excavated earth, lead up to 50m and lift upto 1.5m
All kind of soil | 585.42 | cum | 1,450 ₹8,48,859 | 120 ₹70,250.4 Lowest | 120 ₹70,250.4 Lowest | 193.34 ₹1,13,185.1 | 200 ₹1,17,084 | 200 ₹1,17,084 |
| 1.02 | Random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)
Periphery of semicircle =2 πR | 159.89 | cum | 250 ₹39,972.5 Lowest | 2,800 ₹4,47,692 | 5,500 ₹8,79,395 | 4,350 ₹6,95,521.5 | 5,000 ₹7,99,450 | 4,400 ₹7,03,516 |
| 1.03 | Providing and laying DPC 50mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 12.5mm nominal size) Nallah | 157.89 | sqm | 90 ₹14,210.1 Lowest | 500 ₹78,945 | 450 ₹71,050.5 | 2,000 ₹3,15,780 | 1,940 ₹3,06,306.6 | 2,000 ₹3,15,780 |
| 1.04 | Carriage of materials by M.T of Cement. | 15.63 | MT | 90 ₹1,406.7 Lowest | 1,500 ₹23,445 | 600 ₹9,378 | 250 ₹3,907.5 | 309.21 ₹4,832.95 | 230 ₹3,594.9 |
| 1.05 | Carriage of materials by M.T of Sand and stone agg. | 68.93 | cum | 90 ₹6,203.7 Lowest | 400 ₹27,572 | 550 ₹37,911.5 | 250 ₹17,232.5 | 280 ₹19,300.4 | 224 ₹15,440.32 |
| 1.06 | Carriage of material by M.T of Stone. | 159.89 | cum | 250 ₹39,972.5 | 500 ₹79,945 | 550 ₹87,939.5 | 250 ₹39,972.5 | 250 ₹39,972.5 | 210 ₹33,576.9 Lowest |
| 1.07 | Cost and installation of pipe for spill over includes complete works etc. | 2 | nos | 5,000 ₹10,000 | 2,00,000 ₹4,00,000 | 2,500 ₹5,000 | 2,000 ₹4,000 | 3,000 ₹6,000 | 304 ₹608 Lowest |
Tender Value
₹14.9 L
EMD Value
₹29,740
Closing Date
23 Sept 2025, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Construction of Water harvesting structure (Traditional Zing) at Tirith Plantation of Nubra Forest Range for the Year 2023-24 under (SDP new Scheme)
2025_FEE_17253_5
e-Tender No 14 of FDL 2025-26
Open Tender
Civil Works - Roads
Item Rate
30 days
Nubra
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
Divisional Forest Officer, Leh
₹29,740
25 Oct 2025
16 Sept 2025
25 Sept 2025
16 Sept 2025
23 Sept 2025
16 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .