Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹35.9 L
EMD Value
₹36,000
Closing Date
22 Oct 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer,Tribal Welfare, Waranal
Opp: Ambedkar Bhavan, Ashok Colony, Hanamkonda
1)C/o. Internal CC Roads in Gandhinagar Colony ST Colony (hab) Ghandhinagar Colony (GP) of Chintakani (M), 2) C/o. Internal CC Roads and Drains in Bonakal ST Colony of Bonakal (Hab. and GP) of Bonakal (M), 3) C/o. Internal CC road in Nagulavancha ST Colony (Hab) of Nagulavancha (GP) of Chintakani (M), 4) C/o. Internal CC Roads in Seethampeta ST Colony (Hab) of Seethampeta (GP) of Chintakani (M) in Khammam District
740369
SE/TW/WGL/NIT 432/2026-2027, Dt:05.10.2026
OPEN
Road Work
KHAMMAM, TELANGANA
14 documents required · 10 mandatory · 4 optional
₹1,272
₹36,000
7 Oct 2026
7 Oct 2026
7 Oct 2026
Name of the Work : 1.Construction of Internal CC Roads to Gandhinagar ST Colony of Chinthakani (M) in Khammam District,
GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).
CC Pavement : Construction of plain cement concrete pavement, thickness as specified, over a prepared sub base, with 43 grade cement with coarse and fine aggregates conforming to IS: 383, Adopting to Nominal Mix (1:2:4) Proportional equivalent to M20 Grade mixed in a concrete mixer of not less than 0.2 cum capacity laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork), spreading the concrete with sholvels, rakes, compacted using needle and plate vibrators and finished in continuous operation including 2 provision of construction joints, applying debonding strips or sealant, including curing of concrete slabs for 14-days, and water finishing to lines and grade as per Technical Specification including cost& conveyence of all men and materials, overhead charges for all operations for finished item of work, But excluding GST & Seignarage charges.
Gravel Berms Construction of Gravel Berms by providing well graded material spreading in irrespective thickness in layers compacting including cost& conveyence of all men and materials, overhead charges for all operations, But excluding GST & Seignarage charges.
Groove Cutting of 2-4mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond strudded saw within 24 hours of casting of CC Pavement
Name of the Work : 2.Construction of Internal CC Roads in Bonakal ST Colony of Bonakal (M) in Khammam District,
GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).
CC Pavement : Construction of plain cement concrete pavement, thickness as specified, over a prepared sub base, with 43 grade cement with coarse and fine aggregates conforming to IS: 383, Adopting to Nominal Mix (1:2:4) Proportional equivalent to M20 Grade mixed in a concrete mixer of not less than 0.2 cum capacity laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork), spreading the concrete with sholvels, rakes, compacted using needle and plate vibrators and finished in continuous operation including 2 provision of construction joints, applying debonding strips or sealant, including curing of concrete slabs for 14-days, and water finishing to lines and grade as per Technical Specification including cost& conveyence of all men and materials, overhead charges for all operations for finished item of work, But excluding GST & Seignarage charges.
Gravel Berms Construction of Gravel Berms by providing well graded material spreading in irrespective thickness in layers compacting including cost& conveyence of all men and materials, overhead charges for all operations, But excluding GST & Seignarage charges.
Groove Cutting of 2-4mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond strudded saw within 24 hours of casting of CC Pavement
Name of the Work : 3.Construction of Internal CC Roads in Nagulavancha ST Colony of Chinthakani (M) in Khammam District,
GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).
CC Pavement : Construction of plain cement concrete pavement, thickness as specified, over a prepared sub base, with 43 grade cement with coarse and fine aggregates conforming to IS: 383, Adopting to Nominal Mix (1:2:4) Proportional equivalent to M20 Grade mixed in a concrete mixer of not less than 0.2 cum capacity laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork), spreading the concrete with sholvels, rakes, compacted using needle and plate vibrators and finished in continuous operation including 2 provision of construction joints, applying debonding strips or sealant, including curing of concrete slabs for 14-days, and water finishing to lines and grade as per Technical Specification including cost& conveyence of all men and materials, overhead charges for all operations for finished item of work, But excluding GST & Seignarage charges.
Gravel Berms Construction of Gravel Berms by providing well graded material spreading in irrespective thickness in layers compacting including cost& conveyence of all men and materials, overhead charges for all operations, But excluding GST & Seignarage charges.
Groove Cutting of 2-4mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond strudded saw within 24 hours of casting of CC Pavement
Name of the Work : 4.Construction of Internal CC Roads in Seethampeta ST Colony of Chinthakani (M) in Khammam District,
GSB Grading-III: Construction of Granular sub-base by providing HBG material confirming to Grading - III of MoRT&H Table 400-2 and Table 400.1 of MORD including cost, and conveyance of all materials to work site and spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with Rotavator / approved means at OMC and compacting with vibratory roller to achieve the desired density etc., as per technical specification 401 MORTH (4th revision) and 401 MORD and as directed by the Engineer-in-charge complete for finished item of work ( Payment will be made based on levels for finished item of work ).
CC Pavement : Construction of plain cement concrete pavement, thickness as specified, over a prepared sub base, with 43 grade cement with coarse and fine aggregates conforming to IS: 383, Adopting to Nominal Mix (1:2:4) Proportional equivalent to M20 Grade mixed in a concrete mixer of not less than 0.2 cum capacity laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork), spreading the concrete with sholvels, rakes, compacted using needle and plate vibrators and finished in continuous operation including 2 provision of construction joints, applying debonding strips or sealant, including curing of concrete slabs for 14-days, and water finishing to lines and grade as per Technical Specification including cost& conveyence of all men and materials, overhead charges for all operations for finished item of work, But excluding GST & Seignarage charges.
Gravel Berms Construction of Gravel Berms by providing well graded material spreading in irrespective thickness in layers compacting including cost& conveyence of all men and materials, overhead charges for all operations, But excluding GST & Seignarage charges.
Groove Cutting of 2-4mm for 1/3rd depth of concrete slab using concrete groove cutting machine with diamond strudded saw within 24 hours of casting of CC Pavement
RUPEES THIRTY FIVE LAKHS NINETY TWO THOUSAND FIVE HUNDRED TWENTY ONLY
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BID NIT 432.doc
TENDER_DOCUMENT • 0.48 MB
BOQ NIT 432.xls
TENDER_DOCUMENT • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .