Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L Quoted ₹5.9 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹5.9 L+₹4,155.67 (0.70%)Rejected-Finance ARIMALAM TAMIL NADU | ₹5.9 L+₹4,155.67 (0.70%) | L2 | Rejected-Finance L2 Reject |
| Sl No | Description | Qty | Unit | Arivazhagan L2 | S.MEYYAPPAN L1 |
|---|---|---|---|---|---|
| 1.00Construction of Bus Shelter at Kannankarakkudi near TharmaSasthakoil in Kannankarakkudi Panchayat | |||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 9.68 | cum | 265 ₹2,565.2 | 263.5 ₹2,550.68 Lowest |
| 3.00 | Supplying and filling in foundation and basement with FILLING M.SAND in layers not more 15 cm thick in layers, rammed watered and compacted., complete complying to standard specification. | 3.25 | cum | 1,965 ₹6,386.25 | 1,959 ₹6,366.75 Lowest |
| 4.00 | Cement Concrete 1:4:8 Using 40mm gauge Hand Broken Granite stone jelly for foundation including watering whenever necessary and jaid in layers not more than 15 cm thick compacting etc., complete complying within standard specification and as directed. | 3.69 | cum | 5,635 ₹20,793.15 | 5,625.5 ₹20,758.1 Lowest |
| 5.00 | R.C.C. 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges etc., complete. | 8.71 | Cum | 9,440 ₹82,222.4 | 9,432 ₹82,152.72 Lowest |
| 6.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 89.18 | Sqm | 1,120 ₹99,881.6 | 1,095 ₹97,652.1 Lowest |
| 7.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete | 0.85 | MT | 92,500 ₹78,625 | 91,980 ₹78,183 Lowest |
| 8.00 | Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor. | 12.21 | Cum | 6,210 ₹75,824.1 | 6,204.4 ₹75,755.72 Lowest |
| 9.00 | Special ceiling plastering with cement mortor 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc. complete. | 37.08 | Sq.m | 335 ₹12,421.8 | 330.5 ₹12,254.94 Lowest |
| 10.00 | Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification. | 109.95 | Sq.m | 289 ₹31,775.55 | 288.3 ₹31,698.59 Lowest |
Tender Value
₹6 L
EMD Value
₹6,000
Closing Date
10 Sept 2025, 3:00 pmClosed
Bdo,Arimalam
Pt.Union office Arimalam
Construction of Bus Shelter at Kannankarakkudi near TharmaSastha koil in Kannankarakkudi Panchayat
2025_RDTN_600645_1
Arm/MPLAD/Work
Open Tender
Civil Works
Item Rate
180 days
Arimalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,000
24 Nov 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
10 Sept 2025
4 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .