| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹57.3 LAccepted-AOC | L1 | Accepted-AOC Found 1st Lowest | |
| 2 | L2₹62.5 L+₹5.2 L (9.07%)Rejected-AOC | L2 | Rejected-AOC Found 2nd Higher | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | JMC Enterprises L2 | MAA ELECTRICAL ENERGY L1 |
|---|---|---|---|---|---|
| 0.00The work of Instalation Additional 63/100/250 KVA Distribution Transformer with Extension 11 KV Line/LT Line, construction of plinth & pale fencing for 250 KVA T/Fs and installation of the same on the double pole structure/plinths at- Near KHUTLA MASJID, Near PAHADI BABA, Near KANCHAN PURWA, DAV COLLEGE, AWASTHI PARK, DR BHARGAV, NEAR KIRAN COLLEGE CHAURAHA, NEAR GULAB NAGAR, NEAR GURU RAM RAY VALI GALI, NEAR MAHINDRA FIRST CHOICE, Near Rice mill Attrra Road, Jyoti Nagar Parsuram Talab, Lohiya pul near railway Crossing, Gaytri Nagar, Lodheswar Nagar, Ganga Nagar Phase -01, Attra Chungi Near Nawab Tank Naraini Road, Near Daroo Theka, Goyara Mugli Sardar Ki Chakki Ke Pass, Marathi Dai, NEAR SARVODAY NAGAR, NEAR BABA TALAB, MUKTIDHAM, SHAMBHU NAGAR, Near KHUTALA, Near NIMANIPAR, MAWAI BUJURG, LUKTARA,CHAHITARA, PALHARI, CHILLI, GHURAUNDA, BARSADA BUJURG, BISANDI KHURD, ARBAI, JAMALPUR, NEAR VRINDAVAN VIHAR GULAB NAGAR, Near KHINNI NAKA, Attra Chungi Near Nawab Tank Naraini Road, GULAB BAGH, ROSHAN MARRIEGE HALL, PATHAR PHOD BABA, NEAR NIZAMI TENT, Near KHUTLA RAJGHAT ROAD, NEAR PODHA BAGH, NEAR PT. JAIN DEGREE COLLAGE, Near Sahu PVC, Near Sant Marry School Tindwari Road, Nagar Tindwari Road, Kushwaha Nagar Attrra Road, Kiledar ka Purwa, KAHLA ROAD NEAR AMLU HOUSE BHURAGARH, NEAR BASANT VIHAR, Near KCNIT Naraini road, Near Baba Filling Station Tindwari road Near Badokhar Block Attrra road, Nilam PCO etc. (Block Badokharkhurd) etc. under BUSINESS PLAN SCHEME 2025-26 under EUDD, BANDA, including carriage of all required material/Transformers from ESC/Workshop BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;- | |||||
| 1.00Supply of following materials :- | |||||
| 1.01 | Supply of M.S. Top Channal (125x65x3200) mm as per RESSPO manual. | 64 | No. | 3,516.4 ₹2,25,049.6 | 118 ₹7,552 Lowest |
| 1.02 | Supply of M.S. Dropper Channal as per RESSPO manual. | 64 | No. | 2,773 ₹1,77,472 | 118 ₹7,552 Lowest |
| 1.03 | Supply of M.S. T-off Channal as per RESSPO manual. | 64 | No. | 2,183 ₹1,39,712 | 118 ₹7,552 Lowest |
| 1.04 | Supply of M.S. Base(T/F) Angle with N/B as per RESSPO manual. | 128 | No. | 2,098.04 ₹2,68,549.12 | 118 ₹15,104 Lowest |
| 1.05 | Supply of Channal Clamp with N/B as per RESSPO manual. | 768 | No. | 224.2 ₹1,72,185.6 | 35.4 ₹27,187.2 Lowest |
| 1.06 | Supply of Suspension clamp with I Hook as per RESSPO manual. | 308 | No. | 330.4 ₹1,01,763.2 | 35.4 ₹10,903.2 Lowest |
| 1.07 | Supply of Ded End clamp with I Hook as per RESSPO manual. | 138 | No. | 318.6 ₹43,966.8 | 35.4 ₹4,885.2 Lowest |
| 1.08 | Supply of Piercing clamp as per RESSPO manual. | 828 | No. | 118 ₹97,704 | 11.8 ₹9,770.4 Lowest |
Tender Value
₹58 L
EMD Value
₹60,000
Closing Date
16 Sept 2025, 1:00 pmClosed
SE, EDC, BANDA
Chilla Road, Indira Nagar, Banda
The work of installation of additional DTR under EUDD, Banda (Business Plan 2025-26)
2025_DVVNL_1069505_1
EDCBNDA-24/2025-26
Open Tender
Electrical Works
Item Rate
180 days
Banda
As per annexured
2 documents required · 2 mandatory
₹3,540
DVVNL
₹60,000
SE, EDC, BANDA
17 Jan 2026
29 Aug 2025
16 Sept 2025
29 Aug 2025
16 Sept 2025
29 Aug 2025
30 Aug 2025
The work of Instalation Additional 63/100/250 KVA Distribution Transformer with Extension 11 KV Line/LT Line, construction of plinth & pale fencing for 250 KVA T/Fs and installation of the same on the double pole structure/plinths at- Near KHUTLA MASJID, Near PAHADI BABA, Near KANCHAN PURWA, DAV COLLEGE, AWASTHI PARK, DR BHARGAV, NEAR KIRAN COLLEGE CHAURAHA, NEAR GULAB NAGAR, NEAR GURU RAM RAY VALI GALI, NEAR MAHINDRA FIRST CHOICE, Near Rice mill Attrra Road, Jyoti Nagar Parsuram Talab, Lohiya pul near railway Crossing, Gaytri Nagar, Lodheswar Nagar, Ganga Nagar Phase -01, Attra Chungi Near Nawab Tank Naraini Road, Near Daroo Theka, Goyara Mugli Sardar Ki Chakki Ke Pass, Marathi Dai, NEAR SARVODAY NAGAR, NEAR BABA TALAB, MUKTIDHAM, SHAMBHU NAGAR, Near KHUTALA, Near NIMANIPAR, MAWAI BUJURG, LUKTARA,CHAHITARA, PALHARI, CHILLI, GHURAUNDA, BARSADA BUJURG, BISANDI KHURD, ARBAI, JAMALPUR, NEAR VRINDAVAN VIHAR GULAB NAGAR, Near KHINNI NAKA, Attra Chungi Near Nawab Tank Naraini Road, GULAB BAGH, ROSHAN MARRIEGE HALL, PATHAR PHOD BABA, NEAR NIZAMI TENT, Near KHUTLA RAJGHAT ROAD, NEAR PODHA BAGH, NEAR PT. JAIN DEGREE COLLAGE, Near Sahu PVC, Near Sant Marry School Tindwari Road, Nagar Tindwari Road, Kushwaha Nagar Attrra Road, Kiledar ka Purwa, KAHLA ROAD NEAR AMLU HOUSE BHURAGARH, NEAR BASANT VIHAR, Near KCNIT Naraini road, Near Baba Filling Station Tindwari road Near Badokhar Block Attrra road, Nilam PCO etc. (Block Badokharkhurd) etc. under BUSINESS PLAN SCHEME 2025-26 under EUDD, BANDA, including carriage of all required material/Transformers from ESC/Workshop BANDA to work site, alongwith its loading, unloading & dragging at the respective ends and also carriage of old/dismentled line material/T/Fs from site to store centre/workshop, if any. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. The material supplied by contractor should be the best quality and as per standard including transportation, if any. Details of the work as given below ;-
Supply of following materials :-
Supply of M.S. Top Channal (125x65x3200) mm as per RESSPO manual.
Supply of M.S. Dropper Channal as per RESSPO manual.
Supply of M.S. T-off Channal as per RESSPO manual.
Supply of M.S. Base(T/F) Angle with N/B as per RESSPO manual.
Supply of Channal Clamp with N/B as per RESSPO manual.
Supply of Suspension clamp with I Hook as per RESSPO manual.
Supply of Ded End clamp with I Hook as per RESSPO manual.
Supply of Piercing clamp as per RESSPO manual.
Supply of Alluminium Paint with all accessories as per RESSPO manual.
Supply of Red Oxide Paint with all accessories as per RESSPO manual.
Erection/Instalation/Fixing of following :-
Safe cartage of 8.5 Mtr. long PCC poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
Safe cartage of 11 Mtr. long ST poles from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging.
Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of its dragging.
Erection of Single support on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge.
Grouting of Single support on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each).
Erection of Double support on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge.
Grouting of Double support on 8.5 Mtr. long PCC poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each).
Erection of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge.
Grouting of Double support on 11 Mtr. long ST poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each).
Erection and grouting of stay set with nozelling & binding as per norms.
Fixing of earthing rod as per RESSPO manual.
Laying, stringing, binding and termination etc. LT PVC Cable of size 3.5x150 Sq.mm. on the newly erected D/P as per direction of supervising engineer/RESSPO manual.
Laying, stringing, binding and termination etc. LT PVC Cable of size 3.5x70 Sq.mm. on the newly erected D/P as per direction of supervising engineer/RESSPO manual.
Safe cartage of 250 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging.
Safe cartage of 100 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging.
Safe cartage of 63 KVA Transformers from store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, including the work of dragging.
Installation/Erection/Commisioning of 250 KVA Transformers on the newly/old erected single/doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual.
Installation/Erection/Commisioning of 100 KVA Transformers on the newly/old erected single/doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual.
Installation/Erection/Commisioning of 63 KVA Transformers on the newly/old erected single/doube pole/plinth structure in proper alignment and as per direction of supervising engineer/RESSPO manual.
Laying, stringing, binding and termination etc. of LT ABC Cable of size (3*120+1*95+1*16) Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual.
Laying, stringing, binding and termination etc. of LT ABC Cable of size (3*50+1*35+1*16) Sq.mm. on the newly erected line as per direction of supervising engineer/RESSPO manual.
Painting of ST Pole Structure (DP) with Alluminium Paint as per RESSPO manual.
Painting of ST Pole Structure (DP) with Red Oxide Paint as per RESSPO manual.
Fixing of Distribution Box with fitting of all accessories as per RESSPO manual.
Fixing of 11 KV Fuse set with fitting of all accessories as per RESSPO manual.
Fixing of Danger Board with fitting of all accessories as per RESSPO manual.
Construction of new 11/0.4 kV, 250 KVA Transformer plinth of size 4x4x5 ft. above ground level and one ft. below the ground level of 9”. After excavation of 4” earth, brick ballast shall be provided and rammering will be done properly. After that a retaining wall of 9” width by first class brick in ratio 1:5 of cement and sand shall be made. The earth shall be filled up to one ft. below the top of the plinth. After this brick ballast shall be provided up to 6” from the earth level and proper rammering shall be done. One No. Jail of 12 mm MS tore shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement, sand and stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all around the plinth in 1:4 ratio of cement and sand. The contractor shall be responsible to complete the work as per direction of Supervising Engineer.
Note: Any quantity of item from sl no. 1 to sl no. 2.27 may vary to any limit within the financial value of agreement against this tender.
JMC Enterprises (BID ID -5538033)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .