Tender Value
₹9.9 L
EMD Value
₹10,000
Closing Date
2 Jan 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER(B.Pt)
VIRALIMALAI
Improvements to the Road from Old Panchayat office Building to Pillaiyar Kovil Road at Mathayanipatti in Mathayanipatti Panchayat
2024_RDTN_513975_1
VMLI_GF_24_25_21
Open Tender
Civil Works
Item Rate
VIRALIMALAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
6 Jan 2025
26 Dec 2024
2 Jan 2025
26 Dec 2024
2 Jan 2025
26 Dec 2024
Amount
Improvements to the Road from Old Panchayat office Building to Pillaiyar Kovil Road at Mathayanipatti in Mathayanipatti Panchayat
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying speading and compacting graded stone aggregate to wet mix mecadam (WMM) specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed meterials by tippers to site laying in uniform layers 250mm tk with pavers in subbase course on well prepared surface and compacting with vibratory roller to achive the disired density including cost of materials labours charges rentals for machinery fuel and all other incident charges etc., complete.
Providing and laying primed coat surface using 7.00 kg. of emulsion bitumen for 10 sqm area over wmm surface including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying tack coat over WMM surface using 2.50 kg. of emulsion bitumen for 10 sqm area including cost of bitumen, including labour charges for preparing the surface and applying the required quantity of emulsion bitumen as tack coat etc., complete MOST specification.
Providing and laying premix carpet with seal coat type A for 20mm thickness using 0.18cum of 13.2mm IRC HBG metal and 0.09cum of 11.2mm IRC with 14.6kg of bitumen for premixing 10sqm of premix carpet and 0.09cum of 6.70mm IRC HBG metal with 9.8kg of bitumen for seal coat type A per 10 sqm including cost and conveyance of all materials of the work site and stacking them to the departmental gauge for premeasurement heating the bitumen in bitumen boiler heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 80/100KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet appklication of bitumen for seal coat over premix carpet including labour charges for spreading seal coat seperately over premix carpet including hire charges for fuel charges for mini hot mix plant, bitumen boiler, power roller and all other T&P's employed etc., complete as per clause 509 of MOST specifications.
Pipe Culvert
Earth work excavation in all classes of soil such as hard stiff clay hard red earth, earth murrams gravel stoney erath, earth mixed with fair size boulders as per SS 20B for foundation.etc., complete
Filling with good river M sand including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Cost and supply and fixing of RCC NP3 type 900 mm dia pipe including cost and conveyance of all materials and labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
PALANISAMY CONTRACTOR (BID ID -1223629)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .