Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | -1.50% | ₹8.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.5 L+₹37,165.06 (4.57%)Admitted-Finance | +3.00% | ₹8.5 L+₹37,165.06 (4.57%) | L2 | Admitted-Finance |
Tender Value
₹8.3 L
EMD Value
₹16,520
Closing Date
17 Aug 2026, 10:00 amClosed
Executive officer
jaitaran
Construction of a CC road with drains from the Narayani Mata temple to Anandi Lal Sain house and from Dhagal Ji Sain house to Kamala Bai Vaishnav house.
2026_DLB_581777_1
nit/2026/2135
Open Tender
Civil Works
Percentage
jaitaran
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E O Municipal board Jaitaran, MDRISL Jaipur
₹16,520
Yes
19 Aug 2026
5 Aug 2026
18 Aug 2026
5 Aug 2026
17 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer.
Cement Concrete Grade M-15 and above and PCC blocks | - | cum | 678 | - |
| 2 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.4.10.1 In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.4.10.1.1,Depth upto 1.5 m | - | cum | 229.5 | - |
| 3 | Carriage of Materials by mechanical transport including loading, unloading and stacking : Sand, bazri, ballast, kankar 5KM | - | cum | 203.8 | - |
| 4 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion | - | cum | 2,955 | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 1 | cum | 5,910 | ₹5,904.09 |
| 6 | Steel work welded in built up sections/ framed work including cutting,
hoisting, fixing in position and applying a priming coat of approved
steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | - | kg | 144.5 | - |
| 7 | Stone work (machine cut edges) for wall lining etc. (veneer work)
backing filled with a grout of 12mm thick cement mortar 1:3 (1
cement : 3 coarse sand) including pointing in white cement mortar
1:2 (1 white cement : 2 stone dust) with an admixture of pigment
matching the stone shade : (To be secured to the backing by means
of cramps which shall be paid for separately Red sand stone - exposed face fine dressed with rough backing. 50 mm thick | - | sqm | 2,065 | - |
| 8 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded
20mm nominal size stone aggregate) finished with a floating coat of
neat cement including cement slurry, but excluding the cost of
nosing of steps etc. complete. including Providing /mixing of
synthetic fibers compulsorily complying with IS 16481:2022 of 06
mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.
125 gms per 50 kg Cement up to 900 gms per cum of Concrete/
mortar 40mm thick | - | sqm | 422.5 | - |
| 9 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by EngineerCement Concrete Grade M-15 and above and PCC blocks | - | cum | 620 | - |
| 10 | Carriage of Materials by mechanical transport including loading, unloading lead 1km and stacking;; Earth | - | cum | 161.51 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1033653.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .