Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC lowest amount quoted | |
| 2 | L2₹9.2 L+₹993.77 (0.11%)Rejected-Finance | L2 | Rejected-Finance highest amount quoted |
| Sl No | Description | Qty | Unit | S BHARATHKUMAR L1 | MANIMARAN MAHALINGAM L2 |
|---|---|---|---|---|---|
| 1.00Part.01. RCC Slab Culvert at across Ukkudi Vaikkal in Ukkudi Road @ Melasuriyamoolai-Pt. (Est 9.27 Lakhs) | |||||
| 2.00 | Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation | 83.28 | Cu.m | 263 ₹21,902.64 Lowest | 264 ₹21,985.92 |
| 3.00 | Sand Filling with good river sand including cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 9.25 | Cu.m | 2,527 ₹23,374.75 Lowest | 2,528 ₹23,384 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 6.94 | Cu.m | 6,509 ₹45,172.46 Lowest | 6,510 ₹45,179.4 |
| 5.00 | Centering and shuttering charges for rataining wall side work including cost and conveyance of all labour charges | 146.22 | Sqm | 547 ₹79,982.34 Lowest | 548 ₹80,128.56 |
| 6.00 | Centering and shuttering charges for rataining wall side work including cost and conveyance of all labour charges | 12.51 | Sqm | 1,095 ₹13,698.45 Lowest | 1,096 ₹13,710.96 |
| 7.00 | Cement concrete 1:3:6mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 70.58 | Cu.m | 6,811 ₹4,80,720.38 Lowest | 6,812 ₹4,80,790.96 |
| 8.00 | Cement concrete 1:2:4 mix using 20mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation. | 3.9 | Cu.m | 7,898 ₹30,802.2 Lowest | 7,899 ₹30,806.1 |
| 9.00 | RCC 1:1 1/2 :3 mix using 20 mm iSS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed. | 4.73 | Cu.m | 10,393 ₹49,158.89 Lowest | 10,395 ₹49,168.35 |
| 10.00 | Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works | 0.32 | Mt | 91,858 ₹28,935.27 Lowest | 91,860 ₹28,935.9 |
Tender Value
₹9.3 L
EMD Value
₹9,270
Closing Date
7 Nov 2025, 3:00 pmClosed
Block Development Officer (BP),Thiruppanandal,
Block Development Officer (BP),Thiruppanandal,
RCC Slab Culvert at across Ukkudi Vaikkal in Ukkudi Road at Melasuriyamoolai-Pt in Thiruppanandal Block under General Fund 2025-2026 Tranche
2025_RDTN_619335_1
Rc.No. 1595/2025/A2 dated 30.10.2025
Open Tender
Civil Works
Item Rate
90 days
Panchayat Union Office, Thiruppanandal
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹9,270
Yes
29 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
7 Nov 2025
1 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
pricebid.pdf
Tender Documents • 0.62 MB
technicalbid.pdf
Tender Documents • 0.80 MB
BOQ_740372.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .