| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.1 LAdmitted-Fee/PreQual/Technical/Finance AT GAYATRI MANDAP PO CHANDRASEKHARPUR DIST KHURDA ODISHA | CHANDRASEKHARPUR | KHURDA | ODISHA | -16.50% | ₹32.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹32.7 L+₹58,054.77 (1.81%)Admitted-Fee/PreQual/Technical/Finance NATHPUR LINGIPUR DIST KHORDHA BHUBANESWAR BLOCK BHUBANESWAR | KHORDHA | ODISHA | 751001 | -14.99% | ₹32.7 L+₹58,054.77 (1.81%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹34.7 L+₹2.6 L (7.95%)Admitted-Fee/PreQual/Technical/Finance | -9.86% | ₹34.7 L+₹2.6 L (7.95%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹38.1 L+₹6.0 L (18.6%)Admitted-Fee/PreQual/Technical/Finance | -1.00% | ₹38.1 L+₹6.0 L (18.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹38.4 L+₹6.3 L (19.6%)Admitted-Fee/PreQual/Technical/Finance AT BADALA PANCHBATIA PO BADALASASAN PS BALIPATNA DIST KHORDHA PIN 752106 | PURI | ODISHA | 752106 | -0.10% | ₹38.4 L+₹6.3 L (19.6%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹38.4 L
EMD Value
₹38,447
Closing Date
3 Aug 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BHUBANESWAR
Construction of D type Qtr at R.W. Sub-Division, Balipatna for the year 2026-27_building
2026_CERWI_137240_1
Tender online- 12/2026-27 of BBSR
Open Tender
Civil Works - Buildings
Percentage
90 days
Khordha
2 documents required · 2 mandatory
₹6,000
₹38,447
Yes
4 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
28 Jul 2026 - 3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegitation,grass,bushes,shrubs,saplings and trees of girth upto 300mm,removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be | 1,714 | Sqm | 8.61 | ₹14,757.54 |
| 2 | Earth work in excavation of foundation in hard soil with all leads and lift including rough dressing breaking clods and leveling bed and depositing the excavated materials away from the working area etc. complete as directed E.I.C. | 247.56 | Cum | 282.88 | ₹70,029.77 |
| 3 | Supplying, filling in foundation & plinth with well watered sand in layers not exceeding 150mm thick including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with T&P required for the work etc. complete as per direction of the Engineer-in-charge. | 121.31 | Cum | 599.53 | ₹72,728.98 |
| 4 | Providing Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm(6") thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with T&P required for the work etc. complete i as per direction of the Engineer-in-charge. | 67.01 | Cum | 6,441.15 | ₹4,31,621.46 |
| 5 | Brick work with Fly Ash brick using 25cmx12cmx8cm size bricks having crushing strength not less than 35kg./cm2 with dimensional to lerance 2% in c.c. (1:6) after immersing the bricks for six hours in water before use in foundation & plinth, basement & for ornametal flower heads plinth moulding & similar such type of works with all necessary projection, cutting, moulding, corebelling, chamfering, watering & curing including cost, conveyance, royalties & all type of taxes of all materials & labour, T&P required for the work etc. complete as per specification * direction of the E.I.C. a) Foundation & Plinth | 27.83 | Cum | 5,975.7 | ₹1,66,303.73 |
| 6 | Superstructure (GF) | 26.55 | Cum | 6,009.03 | ₹1,59,539.75 |
| 7 | Superstructure (FF) | 16.98 | Cum | 6,395.01 | ₹1,08,587.27 |
| 8 | R.C.C M-30 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour,centering shuttering etc complete but excluding cost of reinforcement complete. (Item-4, AR-2006) a) Column Base | 15.71 | Cum | 7,222.22 | ₹1,13,461.08 |
| 9 | B) Column (GF) | 5.4 | Cum | 16,623.18 | ₹89,765.17 |
| 10 | Column (FF) | 1.1 | Cum | 18,703.36 | ₹20,573.7 |
stage.html
html • 0.14 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.72 MB
Tendernotice_1.pdf
PDF • 2.96 MB
BOQ_603541.xls
BOQ • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .