| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | 2₹3.6 L+₹7,534.40 (2.17%)Rejected-Finance | 2 | Rejected-Finance 2 |
| Sl No | Description | Qty | Unit | M/S BHASKAR SHARMA CONTRACTOR L2 | Ravi kumar contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 8,980 | Sqm | 4.2 ₹37,716 | 4 ₹35,920 Lowest |
| 2.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 2,734 | Cum | 63 ₹1,72,242 | 62 ₹1,69,508 Lowest |
| 3.00 | Earth work in silt clearance including lift up to 1.5 M and lead up to 200 M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 107 | Cum | 150 ₹16,050 Lowest | 150 ₹16,050 Lowest |
| 4.00 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 22,374 | Sqm | 4.3 ₹96,208.2 | 4.2 ₹93,970.8 Lowest |
| 5.00 | V.R.B. or bridge clearance in Minors, complete in all respect as directed by Engineer in Charge. | 21 | Nos. | 310 ₹6,510 | 300 ₹6,300 Lowest |
| 6.00 | B/W in 1:4 Cement & Coarse Sand including cost of material labour and T&P etc Complete all as specified and directed by Engineer-in-charge. | 3 | Cum | 5,200 ₹15,600 Lowest | 5,200 ₹15,600 Lowest |
| 7.00 | 12mm thick Plaster in 1:4 Cement Mortar including cost of all material, labour, T&P etc. complete for proper completion of work all as specified and directed by Engineer-in-charge. | 37 | Sqm | 195 ₹7,215 | 190 ₹7,030 Lowest |
| 8.00 | Finishing of Walls with water proofing cement paint of approved make such as super snowcem,Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour T&P etc. complete as per directed by Engineer in Charge. | 40 | Sqm | 55 ₹2,200 | 50 ₹2,000 Lowest |
| 9.00 | Printing letter upto 10 cm, Ht.including all cost of materail labour T&P etc. Completed all as specified and as directed by Engineer-in-Charge. | 86 | Each | 12 ₹1,032 | 10 ₹860 Lowest |
| 10.00 | Painting gauge including all cost of material labour T&P etc.Complet all as specified and as directed by Engineer-in-Charge. | 4.6 | RM | 50 ₹230 Lowest | 50 ₹230 Lowest |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
12 Oct 2026, 9:00 amClosed
Executive Engineer
UMBDGC KHURJA
Silt Clearence of Minors
2026_UPIDC_1187133_27
06/EE/2026-27
Open Tender
Civil Works
Item Rate
20 days
UMBDGC KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹7,000
16 Oct 2026
7 Oct 2026
12 Oct 2026
7 Oct 2026
12 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick Bushes and thorny jungle without uprooting, complete in all respect as directed by Engineer in Charge. | 8,980 | Sqm | - | - |
| 2 | Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 2,734 | Cum | - | - |
| 3 | Earth work in silt clearance including lift up to 1.5 M and lead up to 200 M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. | 107 | Cum | - | - |
| 4 | Scraping internal section of existing channel i.e. Bed & slope with silt up to 5cm. complete all as directed by Engineer in Charge. | 22,374 | Sqm | - | - |
| 5 | V.R.B. or bridge clearance in Minors, complete in all respect as directed by Engineer in Charge. | 21 | Nos. | - | - |
| 6 | B/W in 1:4 Cement & Coarse Sand including cost of material labour and T&P etc Complete all as specified and directed by Engineer-in-charge. | 3 | Cum | - | - |
| 7 | 12mm thick Plaster in 1:4 Cement Mortar including cost of all material, labour, T&P etc. complete for proper completion of work all as specified and directed by Engineer-in-charge. | 37 | Sqm | - | - |
| 8 | Finishing of Walls with water proofing cement paint of approved make such as super snowcem,Durrocem, Robiacem Guttucem, supreme quality of required shade on uncoated wall surface (one coat) over coat white cement primer to give even shades after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including curing and cost of all materials labour T&P etc. complete as per directed by Engineer in Charge. | 40 | Sqm | - | - |
| 9 | Printing letter upto 10 cm, Ht.including all cost of materail labour T&P etc. Completed all as specified and as directed by Engineer-in-Charge. | 86 | Each | - | - |
| 10 | Painting gauge including all cost of material labour T&P etc.Complet all as specified and as directed by Engineer-in-Charge. | 4.6 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
C05.pdf
Additional Documents • 0.18 MB
BOQ_2253131.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .