Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC N A | 1 | Accepted-AOC AOC | |
| 2 | 2₹9.8 L+₹56,316 (6.08%)Rejected-Finance VPO DUMERKHA KALAN TEH NARWANA 126116 | DUMERKHA KALAN | JIND | HARYANA | 126116 | 2 | Rejected-Finance 2 | |
| 3 | 3₹10.3 L+₹1.0 L (11.1%)Rejected-Finance PLOT 411 GALI NO 9 GANDHI NAGAR GANDHI NAGAR 122001 | GANDHI NAGAR | GURUGRAM | HARYANA | 122001 | 3 | Rejected-Finance 3 |
| Sl No | Description | Qty | Unit | THE ROHINI COOP L&C SOCIETY LTD. L1 | The V.K. Co-Operative Labour & Construction Society Limited L2 | THE JIYA CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LIMITED L3 |
|---|---|---|---|---|---|---|
| 2.00Operation and Maintenance of AC (Split, Window and Cassette) at Sector 34 office building MCG under limit of Municipal Corporation Gurgaon Year 2026. | ||||||
| 3.00 | Servicing of AC 1.5 ton to 4 ton i.e Window AC all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 8 | Each | 990 ₹7,920 Lowest | 1,000 ₹8,000 | 1,300 ₹10,400 |
| 4.00 | Servicing of AC 1.5 ton to 4 ton (i.e Split ) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 38 | Each | 1,535 ₹58,330 Lowest | 1,580 ₹60,040 | 1,620 ₹61,560 |
| 5.00 | Servicing of AC 1.5 ton to 4 ton (i.e Cassette and Tower) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 35 | Each | 2,230 ₹78,050 Lowest | 2,280 ₹79,800 | 2,330 ₹81,550 |
| 6.00 | Filling of Gas in AC i.e R22, R32, R140 all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 40 | Each | 2,475 ₹99,000 Lowest | 2,600 ₹1,04,000 | 2,850 ₹1,14,000 |
| 7.00 | Supply and erection of Compressor for AC (Window and Split) of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 10 | Each | 15,840 ₹1,58,400 Lowest | 16,200 ₹1,62,000 | 16,500 ₹1,65,000 |
| 8.00 | Supply and Erection of PCB for AC Non Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 15 | Each | 1,980 ₹29,700 Lowest | 2,100 ₹31,500 | 2,250 ₹33,750 |
| 9.00 | Supply and Erection of PCB for AC Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 10 | Each | 4,455 ₹44,550 Lowest | 4,500 ₹45,000 | 4,650 ₹46,500 |
| 10.00 | Supply and Erection of Copper Pipe 1/4 ,5/8,3/8 inch make RR Globel Copper,indigo copper etc including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 140 | Metre | 910 ₹1,27,400 Lowest | 1,000 ₹1,40,000 | 1,080 ₹1,51,200 |
| 11.00 | Supply and Erection of Capacitor for AC (Window and Split) Rating 40 MFD to 100 MFD including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | 30 | Each | 940 ₹28,200 Lowest | 1,000 ₹30,000 | 1,080 ₹32,400 |
Tender Value
₹9.4 L
EMD Value
₹18,704
Closing Date
21 Apr 2026, 12:00 pmClosed
SACHIN YADAV
Municipal Corporation Gurugram
Operation and Maintenance of AC (Split, Window and Cassette) at Sector 34 office building MCG under limit of Municipal Corporation Gurgaon Year 2026
2026_HRY_514877_1
20261749BF70 5CAC 41F5 9BCB A38D58AFFD54285ULB
Open Tender
Civil Works
Works
90 days
Gurugram
Operation and Maintenance of AC (Split, Window and Cassette) at Sector 34 office building MCG under limit of Municipal Corporation Gurgaon Year 2026
2 documents required · 2 mandatory
₹1,180
Yes
₹18,704
Yes
11 May 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
21 Apr 2026
13 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Operation and Maintenance of AC (Split, Window and Cassette) at Sector 34 office building MCG under limit of Municipal Corporation Gurgaon Year 2026. | - | - | - | - |
| 3 | Servicing of AC 1.5 ton to 4 ton i.e Window AC all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 4 | Servicing of AC 1.5 ton to 4 ton (i.e Split ) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 5 | Servicing of AC 1.5 ton to 4 ton (i.e Cassette and Tower) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 6 | Filling of Gas in AC i.e R22, R32, R140 all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 7 | Supply and erection of Compressor for AC (Window and Split) of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 8 | Supply and Erection of PCB for AC Non Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 9 | Supply and Erection of PCB for AC Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
| 10 | Supply and Erection of Copper Pipe 1/4 ,5/8,3/8 inch make RR Globel Copper,indigo copper etc including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Metre | - | - |
| 11 | Supply and Erection of Capacitor for AC (Window and Split) Rating 40 MFD to 100 MFD including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. | - | Each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_593708.xls
BOQ • 0.28 MB
AD0159401.pdf
Additional Documents • 0.89 MB
OT0159401.pdf
Other Document • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .