| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 CrAccepted-AOC | ₹38.3 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹40.2 Cr+₹1.9 Cr (5.01%)Rejected-Finance | ₹40.2 Cr+₹1.9 Cr (5.01%) | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | BINNI CONSTRUCTION PVT LTD L1 | Dipayan Paul and Chanchal Paul JV L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
By Manual Means
In area of non thorny jungle
Quantity=10000x(10-5.5)/10000=4.50 Hect) | 4.5 | Hect | 40,000 ₹1,80,000 Lowest | 55,645 ₹2,50,402.5 |
| 2.00 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201.(i) Girth from 300 mm to 600 mm | 70 | each | 250 ₹17,500 Lowest | 269 ₹18,830 |
| 3.00 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201
(ii) Girth from 600 mm to 900 mm | 8 | each | 450 ₹3,600 Lowest | 460 ₹3,680 |
| 4.00 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201
(ii) Girth from 900 mm to 1800 mm | 2 | each | 900 ₹1,800 Lowest | 921 ₹1,842 |
| 5.00 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
A 5th KM stone | 2 | each | 350 ₹700 Lowest | 370 ₹740 |
| 6.00 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
B Ordinary KM Stone each | 9 | each | 220 ₹1,980 Lowest | 233 ₹2,097 |
| 7.00 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
C Hectometre Stone/200-M stone | 40 | each | 40 ₹1,600 Lowest | 46 ₹1,840 |
| 8.00 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | 55,000 | Sq.m | 10 ₹5,50,000 | 8 ₹4,40,000 Lowest |
| 9.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Widening Portion & Earthwork Cutting ) (75% reuse) | 3,386.25 | Cum | 150 ₹5,07,937.5 Lowest | 178 ₹6,02,752.5 |
| 10.00 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(a) from private land | 1,65,993.75 | Cum | 150 ₹2,48,99,062.5 Lowest | 271 ₹4,49,84,306.25 |
Tender Value
₹38.3 Cr
EMD Value
₹76.5 L
Closing Date
11 Nov 2025, 2:00 pmClosed
CE, PWD(Roads), Assam, Chandmari, Ghy-3
CE, PWD(Roads), Assam, Chandmari, Ghy-3
ASOM_MALA_3.0_25_26_42 Improvement and Upgradation of Anipur to Zamunag roadfrom Ch. 0.00 km (Anipur Tiniali) to Ch. 10.000 k (Chamtilla) via Durllabcherra market under under Asom Mala 3.0 for the year 2025-26
2025_PWD_48434_1
CE/DEV/TB/116/2025-26/41 Dtd- 08.10.2025
Open Tender
Civil Works – Roads
Item Rate
540 days
Sribhumi
Please refer Tender Documents
5 documents required · 5 mandatory
₹20,000
₹76.5 L
Yes
CE, PWD(Roads), Assam, Chandmari, Ghy-3
11 Feb 2026
5 Nov 2025
11 Nov 2025
5 Nov 2025
11 Nov 2025
5 Nov 2025
5 Nov 2025 - 5 Nov 2025
5 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
By Manual Means
In area of non thorny jungle
Quantity=10000x(10-5.5)/10000=4.50 Hect) | - | Hect | 52,994.98 | - |
| 2 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201.(i) Girth from 300 mm to 600 mm | - | each | 255.95 | - |
| 3 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201
(ii) Girth from 600 mm to 900 mm | - | each | 438.55 | - |
| 4 | Cutting of trees, including cutting of trunks, branches and removal of stumps &
roots, refilling refilling, compaction compaction of backfilling backfilling and stacking stacking of serviceable serviceable material material by manual means with all lifts as per Technical Specification Clause 201
(ii) Girth from 900 mm to 1800 mm | - | each | 877.56 | - |
| 5 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
A 5th KM stone | - | each | 352.45 | - |
| 6 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
B Ordinary KM Stone each | - | each | 221.93 | - |
| 7 | Dismantling Kilometre Stone (Dismantling of kilometre stone including cutting of earth, foundation and disposal of dismantled material with all lifts and lead upto 1000 m and back filling of pit.)
C Hectometre Stone/200-M stone | - | each | 43.51 | - |
| 8 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3.0m and lead upto 1000 m as per Technical Specification Clause 301.4. | - | Sq.m | 7.35 | - |
| 9 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Widening Portion & Earthwork Cutting ) (75% reuse) | - | Cum | 169.84 | - |
| 10 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and comp g actin to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
(a) from private land | 0.29 | Cum | 258.21 | ₹74.88 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
Tendernotice_2.pdf
PDF • 7.71 MB
Tendernotice_3.pdf
PDF • 0.60 MB
BOQ_76989.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .