Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | ₹9.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.5 L+₹30,719.03 (3.36%)Rejected-AOC | ₹9.5 L+₹30,719.03 (3.36%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.7 L+₹56,683.38 (6.19%)Rejected-AOC | ₹9.7 L+₹56,683.38 (6.19%) | L3 | Rejected-AOC L3 |
| 4 | L4₹10.0 L+₹82,846.72 (9.05%)Rejected-AOC | ₹10.0 L+₹82,846.72 (9.05%) | L4 | Rejected-AOC L4 |
| 5 | L5₹10.0 L+₹84,189.23 (9.19%)Rejected-AOC | ₹10.0 L+₹84,189.23 (9.19%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | S A V CONSTRUCTIONS L9 | Ganeshprabhu Construction L7 | M/s.K.ARAVINDH L5 | VS CONSTRUCTION L6 | YASHWA SRI CONTRACTOR L2 | SUBASCHANDRABOSE L8 | R.Vasu L3 | SK ENGINEERING CONTRACTOR L4 | Sudharsan Construction L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.001.) Construction of 20000Lit OHT (7.50m Stage) at Bethel AD colony | ||||||||||||
| 2.00 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers.First depth of 0 to 2 m | 37.93 | Cum | 260 ₹9,861.8 | 265 ₹10,051.45 | 236 ₹8,951.48 | 200 ₹7,586 | 232 ₹8,799.76 | 260 ₹9,861.8 | 150 ₹5,689.5 Lowest | 246 ₹9,330.78 | 150 ₹5,689.5 Lowest |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | 1.76 | Cum | 1,700 ₹2,992 | 2,072 ₹3,646.72 | 1,581 ₹2,782.56 | 1,000 ₹1,760 | 1,490 ₹2,622.4 | 1,696 ₹2,984.96 | 1,500 ₹2,640 | 10 ₹17.6 Lowest | 1,200 ₹2,112 |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 2.65 | Cum | 5,300 ₹14,045 | 5,800 ₹15,370 | 4,744 ₹12,571.6 | 4,850 ₹12,852.5 | 4,621 ₹12,245.65 | 5,259 ₹13,936.35 | 4,400 ₹11,660 Lowest | 5,000 ₹13,250 | 4,500 ₹11,925 |
| 5.00RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers. (For items 1.5m to 4.5m below GL) | ||||||||||||
| 6.00 | For items 1.50 to 4.50m below GL | 3.4 | Cum | 9,030 ₹30,702 | 8,000 ₹27,200 | 8,234 ₹27,995.6 | 8,000 ₹27,200 | 7,860 ₹26,724 | 8,944 ₹30,409.6 | 7,800 ₹26,520 Lowest | 8,500 ₹28,900 | 8,000 ₹27,200 |
| 7.00 | For items 0 to 1.50m below GL | 1.18 | Cum | 9,030 ₹10,655.4 | 8,100 ₹9,558 | 8,145 ₹9,611.1 | 8,250 ₹9,735 | 7,860 ₹9,274.8 | 8,944 ₹10,553.92 | 7,800 ₹9,204 Lowest | 8,500 ₹10,030 | 8,000 ₹9,440 |
| 8.00 | For items 0m to 4.5m above GL | 2.26 | Cum | 9,160 ₹20,701.6 | 8,200 ₹18,532 | 8,324 ₹18,812.24 | 8,500 ₹19,210 | 7,973 ₹18,018.98 Lowest | 9,072 ₹20,502.72 | 8,000 ₹18,080 | 8,500 ₹19,210 | 8,000 ₹18,080 |
| 9.00 | For items 4.51m to 7.32 m above | 21.03 | Cum | 9,295 ₹1,95,473.85 | 8,300 ₹1,74,549 | 8,458 ₹1,77,871.74 | 9,000 ₹1,89,270 | 8,087 ₹1,70,069.61 | 9,202 ₹1,93,518.06 | 8,000 ₹1,68,240 Lowest | 9,000 ₹1,89,270 | 8,500 ₹1,78,755 |
| 10.00 | For items above 7.32 m & up to 10.98 m from GL | 5.76 | Cum | 9,550 ₹55,008 | 8,600 ₹49,536 | 8,503 ₹48,977.28 | 9,250 ₹53,280 | 8,313 ₹47,882.88 | 9,459 ₹54,483.84 | 8,000 ₹46,080 Lowest | 9,000 ₹51,840 | 9,500 ₹54,720 |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
2 Jun 2026, 3:00 pmClosed
BDO(BP)
BDO, Kadayampatti
Construction of 20000Lit OHT (7.50m Stage) at Bethel AD colony Danishpet Panchayat in Kadayampatty Block In Salem District General Fund - 2025-26
2026_RDTN_677728_2
Roc.No.2061/2025/A2
Open Tender
Civil Works
Item Wise
120 days
BDO, Kadayampatti
As per tender document
3 documents required · 3 mandatory
₹0
₹11,000
30 Jul 2026
20 May 2026
2 Jun 2026
20 May 2026
2 Jun 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.) Construction of 20000Lit OHT (7.50m Stage) at Bethel AD colony | - | - | - | - |
| 2 | Earth work excavation & depositing on bank with an initial lead of 10 metre & initial lift of 2 metre in Hard shift clay, stiff block cotton, hard red earth shales, murrum, gravel, stoney earth, and earth mixed with small size boulders and hard gravelly soil (SS 20B) for foundation including shoring, strutting, baling out water providing danger light wherever necessary depositing the surplus earth on bank and other incedential charges etc., complete and as directed by TWAD board Officers.First depth of 0 to 2 m | 37.93 | Cum | - | - |
| 3 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers. | 1.76 | Cum | - | - |
| 4 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. | 2.65 | Cum | - | - |
| 5 | RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers. (For items 1.5m to 4.5m below GL) | - | - | - | - |
| 6 | For items 1.50 to 4.50m below GL | 3.4 | Cum | - | - |
| 7 | For items 0 to 1.50m below GL | 1.18 | Cum | - | - |
| 8 | For items 0m to 4.5m above GL | 2.26 | Cum | - | - |
| 9 | For items 4.51m to 7.32 m above | 21.03 | Cum | - | - |
| 10 | For items above 7.32 m & up to 10.98 m from GL | 5.76 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
02.pdf
Tender Documents • 1.39 MB
BOQ_814313.xls
BOQ • 0.30 MB
01.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .