| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAccepted-Finance | ₹3.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹3.0 L+₹2,612.55 (0.88%)Rejected-Finance | ₹3.0 L+₹2,612.55 (0.88%) | L2 | Rejected-Finance EMD TO BE REFUND |
| 3 | L3₹3.0 L+₹3,221.57 (1.09%)Rejected-Finance | ₹3.0 L+₹3,221.57 (1.09%) | L3 | Rejected-Finance EMD TO BE REFUND |
| Sl No | Description | Qty | Unit | Sircon Engineering Services L1 | Rishan Engineering Consultancy L2 | Civil Foundation Engineering L3 |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of Detailed Project Report for proposed widening and strengthening of ranisayer bye pass road from 0.00km to
7.50km under raniganj block in the district of paschim bardhaman.( for 3 roads). | 12.67 | Km. | 1,900 ₹24,073 Lowest | 1,920 ₹24,326.4 | 1,921 ₹24,339.07 |
| 1.10 | Topographical Survey by using ATS/DGPS Machine along the corridor line of 10m both side from the center line of the road or to end of ROW.
Whichever is less and that should be plotted over Mouza Map. Existing Utility lines, Trees, Ponds and other road side structure must be included in that plotted drawing.( for 3 roads). | 12.67 | Km | 1,200 ₹15,204 Lowest | 1,210 ₹15,330.7 | 1,212 ₹15,356.04 |
| 2.00 | Pit Investigation including Pavement Composition.( for 3 roads) | 25 | Per No | 850 ₹21,250 Lowest | 855 ₹21,375 | 857 ₹21,425 |
| 3.00Sub grade Soil Investigation : Sampling & Testing for re-sectioning zone only | ||||||
| 3.10 | Disturbed Soil Sample -1 Nos. / Km. | 9 | Per no. | 200 ₹1,800 Lowest | 202 ₹1,818 | 204 ₹1,836 |
| 3.20 | Undisturbed Soil Sample -1 Nos. / Km. | 9 | Per no. | 200 ₹1,800 Lowest | 202 ₹1,818 | 204 ₹1,836 |
| 3.30 | Soil parameters (Such as LL, PL, Grain Size Analysis, Atterbergs Limit. F.D.D., Natural Moisture Content, M.D.D., O.M.C., Density-Moisture Graph etc.) 1nos / Km | 9 | Per no. | 500 ₹4,500 Lowest | 504 ₹4,536 | 505 ₹4,545 |
| 3.40 | 96 hrs. Soaked CBR for Sample at F.D.D. 1nos / Km | 9 | Per no. | 200 ₹1,800 Lowest | 204 ₹1,836 | 205 ₹1,845 |
| 3.50 | 96 hrs. Soaked CBR for Sample at 97 % M.D.D. 1nos / Km | 9 | Per no. | 200 ₹1,800 Lowest | 204 ₹1,836 | 205 ₹1,845 |
| 3.60 | California bearing ration (CBR) of sub grade of minimum 2 nos / km to be determined as part of preliminary investigation for preparation of project report for re-sectioning zone only.Note: Testing laboratory details, date of testing and the test report to be signed by whom, who have conducted the test. | 18 | Per no. | 500 ₹9,000 Lowest | 504 ₹9,072 | 505 ₹9,090 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
21 Mar 2026, 5:00 pmClosed
EXECUTIVE ENGINNER ADDA ASANSOL
Vivekananda Sarani, Senraleigh Road Near Kalyanpur Housing More,Asansol -713305
Consultancy services for preparation of DPR for the work Improvement of road Ranisayer Bypass and Jamuria Industrial Estate.
2026_ADDA_1022506_1
ADDA/ASN/ED/NIQ-04(2025-2026)
Open Tender
Miscellaneous Works
Item Rate
30 days
ADDA OFFICE ASANSOL
Please refer as uploaded documents
3 documents required · 3 mandatory
₹0
₹6,000
ADDA ASANSOL
15 Jul 2026
14 Mar 2026
25 Mar 2026
14 Mar 2026
21 Mar 2026
14 Mar 2026
18 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of Detailed Project Report for proposed widening and strengthening of ranisayer bye pass road from 0.00km to
7.50km under raniganj block in the district of paschim bardhaman.( for 3 roads). | 12.67 | Km. | 11 | ₹139.37 |
| 1.1 | Topographical Survey by using ATS/DGPS Machine along the corridor line of 10m both side from the center line of the road or to end of ROW.
Whichever is less and that should be plotted over Mouza Map. Existing Utility lines, Trees, Ponds and other road side structure must be included in that plotted drawing.( for 3 roads). | 12.67 | Km | 12 | ₹152.04 |
| 2 | Pit Investigation including Pavement Composition.( for 3 roads) | 25 | Per No | 13 | ₹325 |
| 3Sub grade Soil Investigation : Sampling & Testing for re-sectioning zone only | |||||
| 3.1 | Disturbed Soil Sample -1 Nos. / Km. | 9 | Per no. | 15 | ₹135 |
| 3.2 | Undisturbed Soil Sample -1 Nos. / Km. | 9 | Per no. | 16 | ₹144 |
| 3.3 | Soil parameters (Such as LL, PL, Grain Size Analysis, Atterbergs Limit. F.D.D., Natural Moisture Content, M.D.D., O.M.C., Density-Moisture Graph etc.) 1nos / Km | 9 | Per no. | 17 | ₹153 |
| 3.4 | 96 hrs. Soaked CBR for Sample at F.D.D. 1nos / Km | 9 | Per no. | 18 | ₹162 |
| 3.5 | 96 hrs. Soaked CBR for Sample at 97 % M.D.D. 1nos / Km | 9 | Per no. | 10 | ₹90 |
| 3.6 | California bearing ration (CBR) of sub grade of minimum 2 nos / km to be determined as part of preliminary investigation for preparation of project report for re-sectioning zone only.Note: Testing laboratory details, date of testing and the test report to be signed by whom, who have conducted the test. | 18 | Per no. | 10 | ₹180 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.47 MB
Tendernotice_2.pdf
PDF • 2.00 MB
BOQ_2513024.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .