Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
3 Sept 2026, 4:00 pm
EXEN CRD SMC
EXEN CRD SMC
Upgradation of link road B/w of Macadamization at Chinkral Mohalla.
2026_HAUDD_321274_13
ENIT/47/CRD/SMC/DT.17-08-2026
Open Tender
Civil Works
Percentage
12 days
CHINKRAL MOHALLA
REFER TENDER DOCS
2 documents required · 2 mandatory
₹600
MUNICIPAL ACCOUNT
₹30,000
3 Sept 2026
19 Aug 2026
5 Sept 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. | 20 | ₹300 |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 280 | Sqm | 24.12 | ₹6,753.6 |
| 3 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of scarified material within all lifts and lead upto 1KM by mechanical means. | 502.32 | Sqm | 5.55 | ₹2,787.88 |
| 4 | Preparation of sub grade by excavating earth to an average of 22.5cm depth, dressing to camber and consolidation with road roller 8-12 tonne capacity including making good the undulation etc. with earth or quarry spoils etc. and disposal of surplus material upto dumping site as directed by engineer incharge including all costs and carriages complete. | 538.2 | Sqm | 153 | ₹82,344.6 |
| 5 | Supply, stacking and laying of WBM grade 1st with specified graded stone aggregate 90mm - 45mm size broken query stone @1.21cum to 1.43cum/10sqm of road surface duly hand packed including screening, sorting, spreading to template, watering and consolidation to required gradient and camber with (80-100) KN road roller all inclusive leads, lifts, loading, unloading, head load if any and carriage of materials from nearest approved source to site of work complete (To be laid as per guide line of MOST specification). Finished work to be measured and paid. | 53.82 | Cum | 2,200 | ₹1,18,404 |
| 6 | Supply/ stacking and laying of WBM Grade 2 with specified graded stone aggregate 63mm to 45mm size broken quarry stone @ 0.91 cum to 1.07 cum per 10 sqm of road surface and using of screening 13.2mm size @ 0..12 cum to .15 cum per 10sqm and binding material @ 0.06cum to 0.09 cum per 10sqm of road surface incl sorting , spreading to template , watering and consolidation to required gradient and camber with 80 to 100 KN Road roller all inclusive leads ,lifts , loading , unloading , head load if any and carraige of materials from nearest approved source to site of work complete ( to be laid as per the guidelines of MOST Specifications). Finished work to be measured and paid. | 40.36 | Cum | 2,350 | ₹94,846 |
| 7 | Providing, Laying, Spreading & Compacting graded stone aggregate (size range 53mm to 0.075mm) to wet mix macadam (WMM) specifications including mixing the material with water at OMC mechanical mixer plant carriage of mixed material by Tipper at site with all leads and lifts laying in uniform layers in sub base/ base course on a well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density complete as per technical specification of clause 406.(75mm thick compacted). | 40.36 | Cum | 1,885.95 | ₹76,116.94 |
| 8Providing and applying tack coat using hot straight run bitumen of VG 10 grade including heating the bitumen and spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface to remove all dirt, dust, mud etc and finally brooming the surface as per required specification. (Including cost & carriage of all materials involved upto site of work complete). | |||||
| 8.1 | On WBM surface using tar @0.75kg/sqm. | 538.2 | Sqm | 74.35 | ₹40,015.17 |
| 8.2 | On BT surface using tar @0.5 kg/sqm. | 717.6 | Sqm | 55.2 | ₹39,611.52 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1072180.xls
BOQ • 0.29 MB
47NITEXTENSION1STEXTAFTER1STFRESH.pdf
PDF • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].