| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC | ₹1.5 Cr Quoted ₹1.6 Cr | L1 | Accepted-AOC Lowest Tenderer |
| 2 | L2₹1.6 Cr+₹3.0 L (1.88%)Rejected-AOC | ₹1.6 Cr+₹3.0 L (1.88%) | L2 | Rejected-AOC Second Lowest Tenderer |
| Sl No | Description | Qty | Unit | K SUBBARAMAN L1 | S UDHAYA KUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 358 | m3 | 384 ₹1,37,472 Lowest | 384 ₹1,37,472 Lowest |
| 2.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 89.5 | m3 | 716 ₹64,082 Lowest | 716 ₹64,082 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 26 | m3 | 21,105 ₹5,48,730 Lowest | 21,105 ₹5,48,730 Lowest |
| 4.00 | Supplying and filling in foundation, basement, etc with Stone Dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 92 | m3 | 508 ₹46,736 Lowest | 508 ₹46,736 Lowest |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 27.6 | m3 | 5,786 ₹1,59,693.6 Lowest | 5,786 ₹1,59,693.6 Lowest |
| 6.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 25.99 | m3 | 5,786 ₹1,50,378.14 Lowest | 5,786 ₹1,50,378.14 Lowest |
| 7.00Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. Cement Mortar 1:5 | |||||
| 7.01 | In foundation and basement | 53.5 | m3 | 7,611 ₹4,07,188.5 Lowest | 7,611 ₹4,07,188.5 Lowest |
| 8.00Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 8.01 | In foundation and basement | 8.5 | m3 | 7,978 ₹67,813 Lowest | 7,978 ₹67,813 Lowest |
Tender Value
Refer Docs
EMD Value
₹85,000
Closing Date
20 Aug 2025, 10:00 amClosed
The Superintending Engineer, PWD.,
O/o. The Superintending Engineer, PWD., Buildings (C and M) Circle-1, Chepauk, Chennai-5
Construction of 4 Class Room Building, One Boys Toilet, Drinking water Facility and Compoundwall in GHSS at K.G.Kandigai in Thiruvallur District
2025_PWD_589405_1
PWD/BCMC1/27-6/2025-26
Open Tender
Civil Works
Lump-sum
180 days
K.G.Kandigai
Refer Tender Condition
7 documents required · 7 mandatory
₹0
₹85,000
24 Nov 2025
15 Aug 2025
20 Aug 2025
15 Aug 2025
20 Aug 2025
15 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_708260.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .