| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.3 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹19.5 L+₹2.2 L (12.6%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L2 | Rejected-Finance Lower 2 | |
| 3 | L3₹20.4 L+₹3.2 L (18.3%)Rejected-Finance BELOW SLAUGHTER HOUSE KRISHNA NAGER SHIMLA | SHIMLA | SHIMLA | HIMACHAL PRADESH | L3 | Rejected-Finance Lower 3 | |
| 4 | L4₹22.2 L+₹4.9 L (28.6%)Rejected-Finance | L4 | Rejected-Finance Lower 4 | |
| 5 | L5₹22.5 L+₹5.2 L (29.9%)Rejected-Finance VILLAGE PO GOLI TEHSIL DALHOUSIE DISTT CHAMBA HP | CHAMBA | HIMACHAL PRADESH | 176207 | L5 | Rejected-Finance Lower 5 |
Tender Value
₹28.3 L
EMD Value
₹49,930
Closing Date
25 Feb 2022, 5:00 pmClosed
Executive Engineer
Jal Shakti Division Dalhousie
Remodeling of Flow Irrigation Scheme Goli Jokna in GP Manola Tehsil Dalhousie Distt Chamba HP SH Contraction of head weir, Construction of Pucca main channel 890 Rmt and Construction of RCC outlet 9 Nos
2022_HPIPH_56967_1
JSVD-DLU-/2021-27142-27192 dt. 18.02.2022
Open Tender
Civil Works
Item Rate
365 days
Village Goli
Remodeling of Flow Irrigation Scheme Goli Jokna in GP Manola Tehsil Dalhousie Distt Chamba HP SH Contraction of head weir, Construction of Pucca main channel 890 Rmt and Construction of RCC outlet 9 Nos
8 documents required · 8 mandatory
₹400
Yes
EE JSD Dalhousie
₹49,930
Yes
22 Aug 2022
19 Feb 2022
26 Feb 2022
19 Feb 2022
25 Feb 2022
19 Feb 2022
19 Feb 2022 - 25 Feb 2022
Amount
Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge.
Excavation in drains and Channel etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dressing of side and bed and disposing of excavated earth up to all leads and lifts and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge.
Providing and laying cement concrete 1:3:6 ( 1 cement : 3 sand: 6 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete 1:4:8 ( 1 cement : 4 sand: 8 graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-Charge.
Providing and laying cement concrete work 1 : 2 : 4 ( 1 cement : 2 sand: 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in:-
Foundations footings, bases of calam, channel, and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge. in outlet
In Walls (any thickness but not less than 0.10 metre thickness) attached pilasters, buttersses, plinth and string courses etc. from top of foundation level upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge. (in wall outlet and head weir)
Providing and laying cement concrete work 1 : 2 :4 ( 1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in
Foundations,footings bases of columns and the like and mass concrete within all leads and lifts as per the direction of Engineer-in-Charge. (in foundation of pucca main channel)
Walls (any thickness but not less than 0.10 metre thickness) attached pilasters, buttersses, plinth and string courses etc. from top of foundation level upto floor two level within all leads and lifts as per the direction of Engineer-in-Charge in wall of kuhl (pucca main channel)
Providing form work with steel plates 3.15 milimetre thick welding with angle iron in frame 30x30x5 milimetre, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and ballies for all height of propping and centring below supporting floor to ceiling and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls of kuhl /chnnels (any thickness) partitions and the like including attached pillasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge.
Providing tor steel reinforcement for reinforced concrete work including bending, binding and placing in position complete up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge.
YOG RAJ
sunil kumar
MITTERPAL THAKUR
Subhash Chand
A.R ENTERPRISES
Suraj Rana
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .