| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical DOCUMENT CORRECT |
| 2 | Accepted-Technical UTTAR PRADESH UP | ALIGARH | UTTAR PRADESH | 202001 | Accepted-Technical DOCUMENT CORRECT |
| 3 | Accepted-Technical 14 ILTIFATGANJ AMBEDKAR NAGAR UTTAR PRADESH 224145 UDYAM UP 04 0036158 | AMBEDKAR NAGAR | UTTAR PRADESH | 224145 | Accepted-Technical DOCUMENT CORRECT |
Tender Value
₹40.8 L
EMD Value
₹81,580
Closing Date
18 May 2026, 11:30 amClosed
OFFICE EO NAGAR PANCHAYAT PACHPEDWA DIST BALRAMPUR
OFFICE EO NAGAR PANCHAYAT PACHPEDWA DIST BALRAMPUR
NOTICE NO 97 LOT NO - 01
2026_DOLBU_1147013_1
97/N.P.Pach./E-tender/2026-27 Dt. 06-05-2026
Open Tender
Civil Works
180 days
OFFICE EO NAGAR PANCHAYAT PACHPEDWA DIST BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,100
OFFICE EO NAGAR PANCHAYAT PACHPEDWA DISTT BALRAMPU
₹81,580
20 May 2026
9 May 2026
18 May 2026
9 May 2026
18 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK- DHARMA PATH
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 30.62 | Cum | 217.52 | ₹6,660.46 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 26.4 | Cum | 163.79 | ₹4,324.06 |
| 3 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete. | 2.19 | Cum | 1,774.75 | ₹3,886.7 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: | 2.19 | Cum | 5,692.58 | ₹12,449.67 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for :
Foundations, footings, bases of columns, etc. for mass concrete | 9.72 | SQM | 327.71 | ₹3,185.34 |
| 6 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 19.39 | SQM | 615.39 | ₹11,932.41 |
| 7 | Columns, Pillars, Piers, Abutments, Posts and Struts | 78.75 | SQM | 803.33 | ₹63,262.24 |
| 8 | Suspended floors, roofs, landings, balconies and access
platform | 14 | SQM | 774.88 | ₹10,848.32 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 1,741.06 | Cum | 90.13 | ₹1,56,921.74 |
| 10 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cementconcrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.
Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately. | 17.16 | Cum | 7,942.83 | ₹1,36,303.73 |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
BOQ_2145066.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid