Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC | ₹10.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹11.0 L+₹36,518.38 (3.45%)Rejected-Finance | ₹11.0 L+₹36,518.38 (3.45%) | L2 | Rejected-Finance L2 |
Tender Value
₹12.0 L
EMD Value
₹24,000
Closing Date
19 May 2026, 5:00 pmClosed
Executive Engineer PMGSY Division Jammu
Executive Engineer PMGSY Division Jammu
Permanent Restoration of T01 to Talour road damaged during the heavy rainfalls of August-September 2025 under SASCI 2025-26, Package No. JK05-220, Block Sumb, District Samba Call 2nd
2026_JKRRD_147616_1
e-NIT No. EE/PMGSY/J/10 of 2026-27 Dated. 12.05.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
₹24,000
Executive Engineer PMGSY Division Jammu
9 Sept 2026
13 May 2026
20 May 2026
13 May 2026
19 May 2026
13 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) inclu.
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge.All kinds of soil : | 101.57 | Cum | 256.85 | ₹26,088.25 |
| 2 | Providing and laying in position cement conc. of specified grade incl curing but excl. the cost of centering and shuttering – All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand :8 graded stone agg.40mm nominal size ) | 7 | Cum | 5,202.9 | ₹36,420.3 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with1:3:6 (1 cement :3 coarse sand :6 graded stone agg. 20 mm nominal size) | 13.01 | Cum | 5,733.6 | ₹74,594.14 |
| 4 | Providing and making Gabion structure with Mechanically woven Double twisted Hexagonal Shaped wire with mesh gabion boxes | 442 | Cum | 1,765.59 | ₹7,80,390.78 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 138.6 | Sqm | 286.35 | ₹39,688.11 |
| 6 | 12 mm thick cement plaster of mix 1:4 | 92.4 | Sqm | 283.8 | ₹26,223.12 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 34.65 | Sqm | 416.5 | ₹14,431.72 |
| 8Carriage of the materials by M.T. incl. loading, unloading & stacking complete | |||||
| 8.01 | Stone agg. below 40mm nominal size for an avg. lead of 50Kms | 49.19 | Cum | 741.13 | ₹36,456.18 |
| 8.02 | Stone nominal size for an avg. lead of 25 Kms | 263.4 | Cum | 547.2 | ₹1,44,132.48 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_230396.xls
BOQ • 0.24 MB
CorrigendumNIT10.pdf
PDF • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .