Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | -33.01% | ₹6.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 L+₹50,066.85 (7.33%)Admitted-Fee/PreQual/Technical/Finance | -28.10% | ₹7.3 L+₹50,066.85 (7.33%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.9 L+₹1.1 L (15.4%)Admitted-Fee/PreQual/Technical/Finance | -22.70% | ₹7.9 L+₹1.1 L (15.4%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.9 L+₹1.1 L (15.9%)Admitted-Fee/PreQual/Technical/Finance | -22.39% | ₹7.9 L+₹1.1 L (15.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.2 L
EMD Value
₹10,197
Closing Date
21 May 2026, 5:00 pmClosed
Superintending Engineer
O/o the S.E, RandB Division, Nayagarh
Repair and Renovation of PWD IB to Kusumi River road for the year 2026-27 (Such as Existing CC Drain cover slab from 0/00km to 0/800 km LHS and CC road Pothole repair)
2026_EICCL_129231_3
eTCN03 of 2026-2027
Open Tender
Civil Works - Roads
Percentage
60 days
Nayagarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,197
Yes
29 May 2026
14 May 2026
22 May 2026
14 May 2026
21 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.
Drain Wall | - | cum | 5,707.94 | - |
| 2 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.
Cover Slab | - | cum | 6,957.06 | - |
| 3 | Providing M.S. reinforcement for R.C.C. work including cutting, bending, binding and tying the grills and placing in position including cost of binding wire 18 to 20 gauge and cost and carriage of steel. etc. complete. | - | Qntl | 9,542.72 | - |
| 4 | 12mm thick C.P. in C.M.(1:6) over brick masonary to the smooth surface including watering, curing, cost, carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | - | Sqm | 191.69 | - |
| 5 | Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 1 | Cum | 5,623.73 | ₹5,618.11 |
| 6 | Construction of embankment with approved materials obtained from borrow pits with all lifts and leads transportating to site within a lead of 5km and spreading grading to required slope and compacting to meet reqirement of table 300-2 and Clause-305 of MoRT&H specifications for Road & Bridge Works (4th Revision). | 1 | qntl | 203.91 | ₹203.71 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_591270.xls
BOQ • 0.33 MB
DTCN0303.pdf
Tender Documents • 1.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .