Loading…
Loading…
Tender Value
₹6.8 L
EMD Value
₹13,700
Closing Date
3 Sept 2026, 4:00 pm
Superintending Engineer, ECTC Jhansi
Office of the Superintending Engineer ECTC, Mata Tila Hydel Colony, Civil Lines, Jhansi
Construction of Open Store and other related works at 132 KV S/S Hasari Distt. Jhansi
2026_UPCTL_1174900_1
E-Notice No. 16/ECTCJ/2026-27
Open Tender
Construction Works
Percentage
30 days
132 KV S/S Hasari Distt. Jhansi
Please refer tender documents
2 documents required · 2 mandatory
₹1,180
EE ECTD Jhansi
₹13,700
5 Aug 2026
5 Aug 2026
4 Sept 2026
5 Aug 2026
3 Sept 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. (Code No. 2.25 (a)) | 98 | Cum | 447.91 | ₹43,895.18 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. (Code No. 2.27) | 21.6 | Cum | 1,546.37 | ₹33,401.59 |
| 3 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. (Code No. 2.31) | 200 | Cum | 12.82 | ₹2,564 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) (Code No. 4.1.8) | 13 | Cum | 4,960.03 | ₹64,480.39 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Code No. 5.1.2) | 32.4 | cum | 6,586.49 | ₹2,13,402.28 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (Code No. 5.9.1) | 21 | Sqm | 285.54 | ₹5,996.34 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. (Code No. 5.22.6) | 1,098 | Cum | 78.53 | ₹86,225.94 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6 (1 cement : 6 coarse sand) (Code No. 6.1.2) | 9.66 | kg | 5,193.21 | ₹50,166.41 |
| 9 | Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 1:6 (1cement : 6 coarse sand) (Code No. 11.1.2) | 75 | Cum | 703.05 | ₹52,728.75 |
| 10 | 12 mm cement plaster of mix : 1:6 (1 cement: 6 coarse sand) (Code No. 13.4.2) | 21 | Kg | 250.22 | ₹5,254.62 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_2207721.xls
BOQ • 0.29 MB
PQC16.pdf
Additional Documents • 3.00 MB
Booklet2025.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].