Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.3 LAdmitted-Finance | -7.11% | ₹10.3 L | L1 | Admitted-Finance |
| 2 | L2₹12.2 LAdmitted-Finance | +9.45% | ₹12.2 L | L2 | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹23,400
Closing Date
19 May 2026, 2:00 pmClosed
SECRETARY
uit alwar
Repair work of Boundary Wall (west side) at Moti Dungari, Alwar.
2026_UITAL_558469_9
NIT 03/2026-27/
Open Tender
Civil Works
Percentage
120 days
UIT ALWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Secretary, UIT
₹23,400
Yes
29 May 2026
13 May 2026
19 May 2026
13 May 2026
19 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 60 | Cum | 175 | ₹10,500 |
| 2 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge:
In cement mortar. | 10 | Cum | 641 | ₹6,410 |
| 3 | Carriage of earth, sand, lime, morrum, manure or sludge including loading/ unloading etc. complete with lead upto 15km. | 90 | Cum | 94.3 | ₹8,487 |
| 4 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 5 | Cum | 3,302 | ₹16,510 |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 5 | Cum | 3,479 | ₹17,395 |
| 6 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 5 | Cum | 2,838 | ₹14,190 |
| 7 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 150 | Cum | 4,934 | ₹7,40,100 |
| 8 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 300 | Sqm | 157 | ₹47,100 |
| 9 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Raised and cut pointing. | 150 | Sqm | 233 | ₹34,950 |
| 10 | "Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade including all scaffolding:
"
Two or more coats on new work including prepartion of base with primer, putty, lippy etc complete in all respect. | 2,000 | Sqm | 80 | ₹1,60,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 0.22 MB
BOQ_995018.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].