| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 LAccepted-AOC MEENATCHIPURAM NATHAM | ₹23.8 L Quoted ₹23.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹23.6 LRejected-Finance | ₹23.6 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Om Muruga Builders L1 | SMS CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.001. Construction of Steel bridge for Burial ground at Mulaiyur, H/O Mulaiyur ESTIMATE AMOUNT : RS. 23.75 LAKHS | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 157.56 | one cubic metre | 260 ₹40,965.60 | 300 ₹47,268 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 0.88 | one cubic metre | 1,787.35 ₹1,572.87 | 1,800 ₹1,584 |
| 4.00 | Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 28.22 | one cubic metre | 5,421.2 ₹1.5 L | 5,421.2 ₹1.5 L |
| 5.00Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton | |||||
| 6.00 | BELOW GL | 281.7 | cu.m | 547.5 ₹1.5 L | 547.5 ₹1.5 L |
| 7.00 | ABOVE GL | 27.15 | Sq.m | 1,095 ₹29,729.25 | 1,095 ₹29,729.25 |
| 8.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 104.63 | Sq.m | 5,693.98 ₹6.0 L | 5,693.98 ₹6.0 L |
| 9.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 0.72 | MT | 91,910.02 ₹66,175.21 | 91,910.02 ₹66,175.21 |
| 10.00Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | |||||
Tender Value
₹23.8 L
EMD Value
₹24,000
Closing Date
5 Jan 2026, 3:00 pmClosed
Block Development Officer (BP), Natham
Block Development Office, Natham
Construction of Steel bridge at Mulaiyur, H/O Mulaiyur
2025_RDTN_637012_1
TN-05-137-FBDP-2025-26
Open Tender
Civil Works - Bridges
Natham
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹24,000
Yes
Block Development Office, Natham
13 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
5 Jan 2026
29 Dec 2025
31 Dec 2025
Amount
1. Construction of Steel bridge for Burial ground at Mulaiyur, H/O Mulaiyur ESTIMATE AMOUNT : RS. 23.75 LAKHS
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Four sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton
BELOW GL
ABOVE GL
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Reinforced Cement Concrete 1:1.5:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
ABOVE GL
Supplying, Fabricating and Erection of Structural Steel Bridge in Grade E- 250 including one coat Metal Primer ,Two Coat Tar Paint, Fasteners and Transport.(Complete Material and Labour)
Supplying and Laying of Deck sheet including Cost of MS sheets, MS angle, Silver Oak Joists and Casurina pumps and all labour charges
Supplying and fixing in position of G.I. Pipe Hand Rails 40mm
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SMS CONSTRUCTION (BID ID -1552223)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_762411.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid