Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 363 39KA HASSANGANJ BAWLI KUMAR COMPANY 363 39 KA HASAN GANJ BAWLI SAADAT GANJ LUCKNOW SAADATGANJ | Admitted-Finance |
| 2 | Rejected-Technical NO 10A 50 REDDY PALAYAM ATHIPATTU CHENNAI 600 120 | CHENNAI | CHENNAI | TAMIL NADU | 600120 | Rejected-Technical withdraws his tender |
Tender Value
₹36.0 L
EMD Value
₹36,000
Closing Date
5 Oct 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE GCC II ,Alandur ,CHENNAI -16
Superintending Engineer, GCC II ,230 KV CMRL GIS SS , Alandur, chennai 16.
As per NIT
2020_EB_180709_1
PT - 02/20-21 OF SE GCC II CNI
Open Tender
Civil Works
Works
60 days
Mambakkam SS
Please refer Tender documents
2 documents required · 2 mandatory
₹0
₹36,000
Yes
16 Nov 2020
21 Sept 2020
6 Oct 2020
21 Sept 2020
5 Oct 2020
22 Sept 2020
90 days
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc. complete.
Providing anti termite treatment in 4 stages I) immediate after earth work excavation and before laying foundation concrete II) after refilling for sides of foundation III) Before laying of flooring concrete IV) outside of basement upto 1.0m alround the building using BIFLEX-C termite 250ml for 10lit of water etc. complete.
Supplying and filling M.sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete
Plain cement concrete 1:3:6 using 12 to 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For raft concrete.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For column concrete. Upto Ground floor roof
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement- for Grade beam
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement- for plinth beam
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Continuous lintel concrete.Ground floor
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. but excluding cost of steel reinforcement. For Sunshade concrete 60cm projected, 80mm Tk. at wall and 50mm Tk. at free end.Ground floor.
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Roof Beam concrete.Ground floor
RCC 1:1.5:3 mix using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For Roof slab concrete 125mm Tk.Ground floor
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Brick work in CM 1:5 using II class chamber burnt bricks for basement & superstructure including cost of all materials, all labour lead lift etc ., complete. super structure, including cost of all materials, all labour charges, lead, lift, etc. complete. Ground floor
Plastering with cm 1:5, 12mm thick for walls including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Plastering with cm 1:3, 12mm thick for ceiling, beams, sunshade including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Providing weathering course with 20mm size brick jelly concrete over roof slab with lime brick jelly 32:12.5, well beaten with wood beaters and giving rise to the required slab with 80mm average thickness and laying one course of pressed tiles of size 23x23x2cm embedded with cm 1:3, mixed with crude oil at 10% by weight of cement and pointed with the same oiled mortor including cost of lime, brick jelly, cement all materials, curing, labour, lead and lift etc., and including cost of material and labour for applying water proof component over the terrace before laying brick jelly concrete, as base coating etc., complete.
Painting two coats with approved quantity White distember over a waterbase primer as priming coat, for interior ceiling and surfaces including cleaning the plastered surface, cost of all materials, labour, lead, lift, T&P, etc. complete.
Painting the inside walls with two coats of best quality interior emulsion of approved colour over a interior primer coat of all materials, etc., complete.
Painting the outside walls with two coats of APEX cement paint over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete.
Flooring with approved joint free vitrified tiles 600x600mm of approved Quality, design & colour (Johnson or equivalent make)laid in cement mortar 1:3 -20mm thick including pointing with same coloured cement using 0.4kg/sqm, finishing the joints, including cost of all materials, labour, lead, lift, etc. complete.
Supply and fixing in position of anodized aluminium UPVC special type window with full view of yard as per IS code with 12mm thick toughened sun cool glass panelling including cost of all materials, locking arrangements labour, lead, lift, etc., complete. (Local market Rate)
Supplying and fixing MS grills for windows and ventilators and other items using MS Flat and square rods as directed by the Engineer at site including painting two coats with enamel paint over a coat of primer cost of materials, labour, lead and lift etc., complete.
Supplying ,filling & spreading of good quality gravel layer by layer with proper consolidation for substation yard, low lying area,road berms , behind of abutment & wing wall including cost of all materials ,labour, lead., lift etc.Complete.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .