Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance HNO 365 STREET NO 12 TALAB TILLO JAMMU RISHI TRADING CO TALAB TILLO ROAD OPP FRIENDS LANE JAMMU JAMMU KASHMIR 180002 | JAMMU | JAMMU AND KASHMIR | 180002 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
4 Jan 2022, 2:00 pmClosed
SE EWC Gorakhpur
Office of S.E. E.W.C Mohaddipur, Gorakhpur.
Dismantling and Shifting of H.T.L.T. Lines at Railway Sampar No.06 Lane 02 Road from Maniram to Balapar Tikariya Marg Gorakhpur
2021_PVVNV_662018_1
04/EWC(G)/2021-22
Open Tender
Electrical Works
Item Wise
60 days
Maniram Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EWC Gorakhpur
₹5,000
5 Jan 2022
22 Dec 2021
4 Jan 2022
22 Dec 2021
4 Jan 2022
23 Dec 2021
Amount
PART-A, Carriage of following materials from store centre to work site for Shifting of Temporary Line.
ST Poles 9 MTR
Petty stock materials
11 KV ‘XLPE’ Cable 3x70 mm²
LT ABC Cable (3x95+1x70+1x16)
Temporary Laying/Hanging of 11 KV Cable 3x70 Sq.mm as per required specification of UPPCL Norms..
Temporary Laying/Hanging of LT ABC Cable (3x95+1x70+1x16) after providing all required clamps etc.
Erection & fitting of 11 KV Polimeric Disc Insulator with fitting, 11 KV X-arm, 11 KV Polymer pin insulater, t-off channel in the path shifting of line as per site required complete work in all respect.
Erection of 9 mtr. Long ST Pole for differents work in temporary shifting with required fittings of HT/LT line after providing all clamps for HT/LT Line as per site & required specification of UPPCL Norms and as per site required.
Providing and fitting of LT ABC Cable Hanging clamp
Installation and fitting of 3 Phase D.B. Box after providing For LT Line as per RESSPO (I Hook, suspension ,dead-end,A-Clamp, Pearsing etc materials for installation of DB box & for hanging the LT ABC Cables on the poles in all span)
Disconnection and Reconnection of all Existing LT cables of consumer connection in the path of Shifting of line complete work in all respect.
Laying of 200 mtr LT Cable 2x10 sq. mm in the path shifting of line as per site required for consumer connections complete work in all respect.
Jointing charges of Cable Jointing Kit for 11 KV Cable 3x70 Sq. MM
Grouting of stay rods after providing stay clamp for ST Pole as per RESSPO (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension .
Dismentling of existing LT ABC Cables of different sizes safely and Re-laying on poles with complete work in all respect.
Re-Erection of 9/11 mtr. Long ST Pole for differents work in temporary shifting with required existing fittings of HT/LT line if needed again shifting of line .
Safe dismantling of existing shifted HT/LT line cables & Re-laying of HT/LT line cables if needed again shifting of line .
Shifting of existing 10 KVA T/F after safe dismentling, installation of T/F on poles with complete earthig complete in all respect ( all clamps & Lug provided by contracter) (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Shifting of existing 250 KVA T/F after safe dismentling, installation of T/F on poles with complete earthig complete in all respect & construction of 250 KVA T/F Plinthas per RESSPO ( all clamps & Lug provided by contracter) (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Dismentling of existing temporary all HT/LT Lines with all materials with distribution transformer on running condition with complete fitting and Shifting,Loading Carriage & Unloading of old and used Line materials from Work site Store to store centre Gorakhpur at the end of final shifting.
PART-B, Carriage of following materials from store centre to work site for Construction of Permanent Line.
ST Poles 9 MTR
Petty stock materials
11 KV ‘XLPE’ Cable 3x70 mm²
25/ 63 KVA T/F
Jointing charges of 11 KV ‘XLPE’ C/J Kit 3x70/185 mm² Outdoor & earthing of jointing kit properly.
Grouting of stay rods after providing stay clamp for ST Pole as per RESSPO (16 x 1800) mm including all work of excavation, cement concrete in size (0.60 x 0.60 x 0.30) m in ratio 1:4:8 cement, sand, 40mm brick ballast) as per drg including back filling, proper ramming etc. Fixing tightening & nozzling of stay wire with stay rod with the poles of required tension .
Laying of 11 KV ‘XLPE’ cable in air after providing 4” dia.M.S. pipe 3m long and all clamps with Complete work.
Laying of 11 KV 3x70 mm² ‘XLPE’ cable(D/C) by digging pit & making trench in Proper size(1M depth x0.7M wide) below ground level by fixing bricks(4½˝)on both side of trench wall and 9˝ brick work at the centre of the trench along the cable.Fixing brick slab on top after filling sand around both the cable including cost of bricks and sand as per site required.
Laying of 11 KV 3x185/70 mm² ‘XLPE’ cable(D/C) by HDD Methed as per site required.
Providing and Laying HDPE Pipe 4 inch (PN-6) for passing of LT/HT cable different size as per site required.
Erection of Double Pole on ST Pole 9 mtr for 11 KV as per RESSPO with all fitting as per RESSPO including all works of evocation of pit, pole erection, grouting in the ratio 1:4:8 (cement, sand, 40 mm brick ballast),back filling of earth ,proper ramming & fitting of all accessories (Painting of poles, T/F/ M.S. angle iron bracing clamps , top channel clamps, number plate,danger board with clamp,E Bracket, barbed wire ,Painting, packing piece etc. Provided by contracter as per Resspo) (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Erection and Installation of 63 KVA New T/F on double pole with all materials as per RESSPO complete in all respect after providing all clamps ( all clamps & Lug provided by contracter) (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Erection and Installation of 25 KVA New T/F on double pole with all materials as per RESSPO complete in all respect.( all clamps & Lug provided by contracter) (all materials which will not be provided by the store and which are nessasary to do the work,have to be provided.)
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from work site to JE Dump store Gorkahpur Distt. Gorakhpur.
Shifting,Loading Carriage & Unloading of old and damaged 11 KV Line materials from JE Dump store to store centre Gorkahpur Distt. Gorakhpur.
M/S SHUKLA ENTERPRISES
Rishi Trading Co.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .