| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.7 Laccepted-aoc | ₹8.7 L | accepted-aoc |
Tender Value
₹14.3 L
EMD Value
₹14,332
Closing Date
16 Apr 2026, 3:00 pmClosed
CGM(Engg) Revenue Circle
Khairatabad Hyderabad
Laying of Water Supply lines in various localities under O and M Dn.No. XVIII,XXII and XX under Deposit Contribution Works
691574
EP-3/CGM(E)/RC/2026-27, Dt:08.04.2026
OPEN
Water Supply
HYDERABAD
11 documents required · 11 mandatory
₹508
₹14,332
1 May 2026
9 Apr 2026
9 Apr 2026
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for Junction and all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Lowering the 300mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 350mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Cutting of 300mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 300mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 200mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 350mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 300mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 200mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 350mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Supply delivery and filling of quarry dust (50% Rubbish 50% HBG Stone 2.36 mm) where ever required as directed by departmental officers including cost and conveyance stacking leveling watering tampering rolling all leads lobour charges and other incidental and operational charghes etc. complete as directed by the HMWS&SB Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Jointing of 200mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
Making dummy arrangements to 200mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
(Rupees One Lakhs Eighty Two Thousand Three Hundred and Seventy Seven and Forty Paisa only)
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for Junction and all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Lowering the 300mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 200mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 300mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 200mm dia DI pipes with s/s ends with rubber gaskets for tyton joints and laying true to alignment and gradient including the cost of labout but excluding the cost of material such as rubber gaskets etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 300mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 200mm dia D.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 300mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Jointing of 200mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite machine crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
(Rupees Nine Lakhs Seventy One Thousand One Hundred and Sixty Three and Thirty Nine Paisa only)
Cutting open CC road surface including labour charges, all leads and other incidental and operational charges tools and plants etc complete for pipe line trenches as directed by the HMWS&SB Engineers.
Cutting open BT Road surface including labour charges all leads, lifts and conveyance of all materials labour charges and other incidental and operational charges, tools and plants etc. complete as directed by the HMWS&SB Engineers.
Earth Work Excavation and depositing on bank in all types of soils like black cotton soil, red earth and ordinary gravel,hard gravelly soils, mixure of gravel, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by departmental officers,including protecting the walls and other structures,existing water supply lines,sewews sewers, power cables, telephone cables/ducts, storm water drains, traffic signals etc., wherever it is possible so as not to disturb the existing utilityservices etc., taking all precautionary measures in the restricted areas such as urban areas including diversion of the traffic,removal of strumps and other deleterious material and disposal upto a lead of 50m, dressing of side and bottom and including backfilling for pipeline trenches for laying water suppy/sewer lines all incidential and operationals charges etc.,complete as directed by the HMWS&SB Engineers.
Cutting of 150mm dia CI pipes without water in the main etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Lowering the 150mm dia DI pipes (all classes) and specials(Fittings) with s/s ends carefully into the ready made trenches and laying them true to alignment and gradient including labour charges, operational charges etc., but excluding conveyance of pipes from Board stores to work site etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 150mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Jointing of 150mm dia CI/DI pipes and fittings with rubber gaskets excluding the cos of rubber gasket but including all sundries filling with a water lead upto 500M and testing to required pressure etc complete as directed by the HMWS&SB Engineers.
Labour charges for lowering and keeping in position 250mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Labour charges for lowering and keeping in position 150mm dia C.I. Sluice valves including conveyance of all materials etc., complete as directed by the H.M.W.S.&.S. Board Engineers.
Jointing of 250mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Jointing of 150mm dia pipes and valves with flanged ends including the cost of jointing materials such as bolts nuts rubber insertion white lead and including filling with a water lead upto 500M and testing to required pressure etc., complete as directed by the HMWS&SB Engineers.
Making dummy arrangements to 150mm dia DI and CI inculding cost of CI socket tail piece with MS dummy plate and of Pig lead spun yarn and cost of joining material and all labour charges etc., complete as directed by the HMWS&SB Engineers.
Conveyance of pipes from the departmental stores to work site including loading, unloading and labour charges etc. complete as directed by the H.M.W.S.&.S. Board Engineers.
Supply and delivery fixing of RCC precast manholes chambers having the size of 36" at bottom tappering to 21" dia at top fixing in CC 1:4:8 Prop along with FRC cover HD -20 and frame laying CC design mix M-30 prop: Including cost of materials labour charges earth work curing conveyance etc., complete as directed by the HMWS&SB Engineers.
Carting away the surplus excavated materials such as rock / earth from the site to a suitable distance of about 8 Kms including loading, unloading, conveyance charges and dumping the carted material at the contractors cost labour charges, all leads and lifts, all other incidential and operational charges etc., complete. as directed by the H.M.W.S.&. S. Board Engineers.
Barricading, Boarding, lighting and Watching etc., for pipe line trenches etc., complete as directed by the HMWS&SB Engineers.
Plain Cement Concrete (1:2:4) mix with 6mm to 20 mm guage hard granite Hand crushed metal including cost and conveyance of all meterial to site, machine mixing of concrete, lifts, leads, form work laying in position, vibrating, compacting, curing, all labour charges, tools and plants and all other incidental and operational charges etc. complete as directed by departmental officers as directed by the H.M.W.S.&,S. Board Engineers.
(Rupees Two Lakh Seventy Nine Thousand Six Hundred Ninety Two and Sixty Nine Paisa only)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Schedule A.xls
TENDER_DOCUMENT • 0.07 MB
Schedule B.xls
TENDER_DOCUMENT • 0.07 MB
Schedule C.xls
TENDER_DOCUMENT • 0.07 MB
TENDER DOCUMENT.doc
TENDER_DOCUMENT • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .