| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC AT TITIA P O P S KHUNTA DIST MAYURBHANJ 757019 | MAYURBHANJ | ODISHA | 757019 | ₹2.6 Cr | L1 | Accepted-AOC aoc |
| 2 | L2₹2.6 Cr+₹6.5 L (2.55%)Rejected-Finance | ₹2.6 Cr+₹6.5 L (2.55%) | L2 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 3 | L3₹2.9 Cr+₹31.9 L (12.4%)Rejected-Finance AT SHIROLA PO LATHANGA PS TIRTOL DIST JAGATSINGHPUR PIN 754140 | JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | 754140 | ₹2.9 Cr+₹31.9 L (12.4%) | L3 | Rejected-Finance Loss through opening of the Financial Bid (Cover-II) |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per DTCN |
| 5 | Rejected-Technical AT NIWARAPUR PO DORANDA PS CHUTIA DIST RANCHI JHARKHAND PIN 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | - | - | Rejected-Technical As per DTCN |
Tender Value
₹3.3 Cr
EMD Value
₹3.3 L
Closing Date
26 Mar 2026, 5:00 pmClosed
CCE, Eastern (R and B) Circle, Balasore
O/o CCE, Eastern (R and B) Circle, Balasore
Building
2026_EICCL_127182_2
CCEEC-21/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Rairangpur
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹3.3 L
Yes
18 Aug 2026
12 Mar 2026
30 Mar 2026
12 Mar 2026
26 Mar 2026
12 Mar 2026
12 Mar 2026 - 26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL PORTION OF WORK : -
Earth work in excavation of foundation trenches in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 3,154.22 | Cum | 276.88 | ₹8,73,340.43 |
| 2 | Earth work for Soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tipper,trimming bottom and side slopes,in accordance with requirements of lines,grades and cross sectionss and transporting to the embankment for leveling earth. | 425.07 | Cum | 74.79 | ₹31,790.99 |
| 3 | Earth work in excavation of foundation trenches of RETAININGWALL in hard soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,labour cess,T&P,sundries etc. as directed by the Engineer in charge. | 410.85 | Cum | 45.15 | ₹18,549.88 |
| 4 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 913.09 | Cum | 895.56 | ₹8,17,726.88 |
| 5 | RETURN WALL | 37.35 | Cum | 5,514.71 | ₹2,05,974.42 |
| 6 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties, taxes of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 190.91 | Cum | 6,261.9 | ₹11,95,459.33 |
| 7R.C.C. work of M-20 in following works using 12 mm. to 20 mm. (½” to ¾”) size (20 mm. not to exceed 25%) hard black crusher broken granite stone chips of approved quality from approved quarry including hoisting, lowering, laying and compacting concrete, watering curing, centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties, taxes of all materials with all labour,labour cess and T & P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S. rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding and tying the grills and placing in proper position and as per the direction of the Engineer-in-charge. | |||||
| 7.01 | Column Base Footing | 233.23 | Cum | 6,826.12 | ₹15,92,055.97 |
| 7.02 | Column Super Struture | 59.61 | Cum | 16,088.99 | ₹9,59,064.69 |
| 7.03 | Plint Beam | 39 | Cum | 7,696.46 | ₹3,00,161.94 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
dtcn2.pdf
Tender Documents • 1.91 MB
BOQ_584853.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .