Loading…
Loading…
Tender Value
₹4.5 L
EMD Value
₹9,060
Closing Date
17 Sept 2026, 6:00 pm2d left
Executive Engineer Left River Works Division
Office of Executive Engineer LRWD, SMC at Old Fund near Public Park Karan Nagar
Construction of lane drain near the House of Farooq Ahmad Raja late Abdul Rahman MotaLate Mohammad Sidiq at at Rehbaba Sahab Aalikadal
2026_HAUDD_324031_7
NIET 37 e-tendering /2026-27 LRWD
Open Tender
Civil Works
Percentage
60 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
FA/CAO Municipal Account 0216010200000007
₹9,060
Yes
9 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
17 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of labourers for clearance of site etc. | 2 | NO | 553 | ₹1,106 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge:1:3:6 or richer mix (i/c equivalent design mix | 8.5 | CUM | 1,725.2 | ₹14,664.2 |
| 3 | Dismantling damged tile work in floors and roofs including stacking material within 50 meters lead as per the directions of EIC | 208.12 | SQM | 89.95 | ₹18,720.39 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.15 | CUM | 5,202.9 | ₹52,809.44 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 22.1 | CUM | 5,733.6 | ₹1,26,712.56 |
| 6 | 12mm thick cement plaster on walls in 1:6 mix (1 Cement :6 sand ) | 219.82 | SQM | 266.2 | ₹58,516.08 |
| 7 | Form work centering / shuttering including Strutting, Propping etc and removal of form work for:
(a) Foudation, footings, basis, coloums etc | 11.15 | SQM | 286.35 | ₹3,192.8 |
| 8 | Lifting / disposal of excavated/ dismantelled unservicable material from site of work to dumping site by mechinical transport including loading,unloading beyond municipal limits. as per direction of Engineer-in-charge: | 16.07 | CUM | 350 | ₹5,624.5 |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete job including all carriages complete job.
(a) (Welded.) | 475.7 | KG | 138.2 | ₹65,741.74 |
| 10 | P/F of PVC pipe/fittings line heavy duty (Prince made). (Grade-B) with fittings complete job.
A) 200 mm dia | 85.36 | RM | 899 | ₹76,738.64 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1092333.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .