Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹18.4 LAccepted-AOC | 1st | Accepted-AOC The M/s Sunshine Venture is L1 bidder being accepted pl. | |
| 2 | 2nd₹21.3 L+₹2.8 L (15.1%)Rejected-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | 2nd | Rejected-Finance Not being L1 | |
| 3 | 3rd₹25.8 L+₹7.4 L (39.9%)Rejected-Finance | 3rd | Rejected-Finance Not being L1 | |
| 4 | 4th₹25.9 L+₹7.5 L (40.4%)Rejected-Finance SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | 4th | Rejected-Finance Not being L1 | |
| 5 | 5th₹26.6 L+₹8.1 L (43.9%)Rejected-Finance | 5th | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | Sunshine Ventures L1 | Sarkar Enterprises L6 | MOHANLAL MATHRANI CONS. PVT. LTD. L3 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L2 | Galaxy Construction L5 | Ganesh Enterprises L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 2 | 10 Sqm | 1,000 ₹2,000 | 2,500 ₹5,000 | 1,500 ₹3,000 | 300 ₹600 Lowest | 1,500 ₹3,000 | 1,000 ₹2,000 |
| 2.00 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and directed. | 20 | 10 Sqm | 55 ₹1,100 | 2,000 ₹40,000 | 252 ₹5,040 | 12 ₹240 Lowest | 100 ₹2,000 | 200 ₹4,000 |
| 3.00 | M & L Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spread, rolled and consolidating to required gradient and camber complete all as specified and directed | 20 | 10 Sqm | 2,000 ₹40,000 | 3,000 ₹60,000 | 1,500 ₹30,000 | 750 ₹15,000 Lowest | 1,500 ₹30,000 | 2,800 ₹56,000 |
| 4.00 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 20 | 10 Sqm | 200 ₹4,000 Lowest | 1,500 ₹30,000 | 608 ₹12,160 | 500 ₹10,000 | 750 ₹15,000 | 500 ₹10,000 |
| 5.00 | M&L for preparing unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 494 | 10 Sqm | 150 ₹74,100 Lowest | 1,000 ₹4,94,000 | 480 ₹2,37,120 | 250 ₹1,23,500 | 500 ₹2,47,000 | 300 ₹1,48,200 |
| 6.00 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 57 | Cum | 5,100 ₹2,90,700 | 10,000 ₹5,70,000 | 10,808 ₹6,16,056 | 4,200 ₹2,39,400 Lowest | 7,200 ₹4,10,400 | 8,000 ₹4,56,000 |
| 7.00 | M &L for new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 114 | 10 Sqm | 120 ₹13,680 Lowest | 3,200 ₹3,64,800 | 250 ₹28,500 | 200 ₹22,800 | 200 ₹22,800 | 300 ₹34,200 |
| 8.00 | M & L for Bituminous premix semi dense asphaltic concrete 30 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 514 | 10 Sqm | 2,640 ₹13,56,960 | 3,000 ₹15,42,000 | 2,998 ₹15,40,972 | 2,550 ₹13,10,700 Lowest | 3,500 ₹17,99,000 | 3,000 ₹15,42,000 |
| 9.00 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 10 | 10 Sqm | 100 ₹1,000 Lowest | 1,300 ₹13,000 | 801 ₹8,010 | 700 ₹7,000 | 400 ₹4,000 | 1,600 ₹16,000 |
| 10.00 | M & L for marking for preparing bituminous surfaces of road and marking 2.5mm thick center lines, stop lines, dashes, arrows etc and the like n exc 10cm wide on roads pavement with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and as directed by Engineer-in-Charge | 840 | RM | 36 ₹30,240 Lowest | 150 ₹1,26,000 | 48 ₹40,320 | 425 ₹3,57,000 | 55 ₹46,200 | 300 ₹2,52,000 |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
17 Sept 2026, 6:00 pmClosed
Shri Vinay Kumar, IDSE, SE (SAG), CWE
HQ Commander Works Engineer (Army) Mumbai, 24 Assaye Building Colaba, Mumbai-05
REPAIR AND RESURFACING OF ROADS AT GARDEN CITY, DEMPSY ROAD AND INTERNAL ROAD UNDER AT GE DEHU ROAD
2026_MES_785366_1
85348/DR/E8
Open Tender
Civil Works - Roads
Item Rate
Dehu Road Pune
As per NIT and tender documents
8 documents required · 8 mandatory
₹500
GE DEHU ROAD PUNE
₹64,000
Yes
8 Oct 2026
20 Aug 2026
19 Sept 2026
20 Aug 2026
17 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to potholes any depth, not exc 1 sqm each including sweeping free from dust and mud, or water, scoring sunken surfaces in roads, paths, etc. cutting around edges to at least 25 mm in depth, making good by applying tack coat @ 5 kg per 10 sqm, putting in premixed bituminous macadam, well rammed and sealed with binder 9.8 kg per 10 sq m, blinded with 0.09 cu m of stone chippings, 6.3 mm size and again well rammed (including supply of premixed macadam, binder and chippings) depth of potholes exc 30 mm all as specified and directed. | 2 | 10 Sqm | - | - |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm and depth of potholes exc 50mm and n exc 100mm deep complete all as specified and directed. | 20 | 10 Sqm | - | - |
| 3 | M & L Laying and compacting 75 mm thick (compacted thickness) Wet Mix Macadam (WMM) grading as pe table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with water to a dense mass, spread, rolled and consolidating to required gradient and camber complete all as specified and directed | 20 | 10 Sqm | - | - |
| 4 | M&L for preparing unsurfaced water bound macadam by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 7.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 20 | 10 Sqm | - | - |
| 5 | M&L for preparing unsurfaced Black top surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 494 | 10 Sqm | - | - |
| 6 | M & L for premixed bituminous macadam using paving bitumen @ 4% by weight of total mix spread rolled and compacted to required gradient and camber for upto 50 mm consolidated thickness all as specified and directed, | 57 | Cum | - | - |
| 7 | M &L for new Bituminous macadam Surface and applying evenly a priming/tack coat with bituminous primer (paving bitumen) at the rate of 2.5 Kg per 10 Sqm complete all as specified and directed by Engr-in-Charge | 114 | 10 Sqm | - | - |
| 8 | M & L for Bituminous premix semi dense asphaltic concrete 30 mm consolidated thickness with 5.5% binder content by weight of total mix using paving bitumen, rolled and compacted to required camber and gradient complete all as specified and directed. | 514 | 10 Sqm | - | - |
| 9 | M & L for moorum filling in berms of road laid in layers spread levelled and rammed including watering and well ramming with power road roller of spread thickness 100 mm complete all as specified and directed by Engr-in-Charge | 10 | 10 Sqm | - | - |
| 10 | M & L for marking for preparing bituminous surfaces of road and marking 2.5mm thick center lines, stop lines, dashes, arrows etc and the like n exc 10cm wide on roads pavement with hot applied thermo plastic road marking paint of approved colour confirming to BS 3262-1989 with special applicator machine all as per manufacturers instruction complete all as specified and as directed by Engineer-in-Charge | 840 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tenderdocu85348.pdf
Tender Documents • 0.92 MB
BOQ_880032.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .