Tender Value
₹5.3 L
EMD Value
₹10,544
Closing Date
22 Sept 2026, 2:00 pmClosed
Secretary, Cooch Behar Zilla RMC
DM Office, Cooch Behar
Construction of Toilet Block at the DM Office Premises and Renovation work of Ground Floor Toilet Block at Administrative Building of Cooch Behar Zilla RMC
2026_WBSMB_1040876_1
WBCBZRMC /e-NIT- 03/2026-27 DATE 07/09/2026
Open Tender
CIVIL WORKS
Percentage
90 days
DM Office Complex, Cooch Behar
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,544
Yes
22 Sept 2026
7 Sept 2026
24 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Toilet Block
Earth work in excavation of foundation trenches or
drains, in all sorts of soil (including mixed soil but
excluding laterite or sandstone) including removing,
spreading or stacking the spoils within a lead of 75
m. as directed. The item includes necessary trimming
the sides of trenches, levelling, dressing and
ramming the bottom, bailing out water as required
complete.
(a) Depth of excavation not exceeding 1,500 mm. | 4.86 | m3 | 119.27 | ₹579.65 |
| 2 | Earth work in filling in foundation trenches or plinth
with good earth, in layers not exceeding 150 mm.
including watering and ramming etc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)
(a) With earth obtained from excavation of foundation. | 0.97 | m3 | 77.54 | ₹75.37 |
| 3 | A)Filling in foundationorplinthby silver sand in
layers not exceeding 150 mm as directed and
consolidating the same by thorough saturation with
water, rammingcompleteincludingthecostofsupply
of sand. (payment to bemade onmeasurement of
finished quantity | 3.31 | m3 | 633.27 | ₹2,098.02 |
| 4 | Single Brick Flat Soling of picked jhama bricks including
ramming and dressing bed to proper level and filling joints with
local sand. | 12.17 | m2 | 322 | ₹3,919.71 |
| 5 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering.
N.B. Variety In ground floor (a) 1:3:6 proportion | 0.91 | m3 | 3,262 | ₹2,974.94 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
ii) Pakur Varity
in Ground Floor | 5.96 | m3 | 4,567.21 | ₹27,211.44 |
| 7 | Reinforcement for reinforced concrete work in all sorts ofstructures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.
(a) For works in foundation, basement and up to roof of ground floor/up to 4 m.
(i) Tor steel/Mild steel.
I. Other than TATA
in Ground Floor - | 0.7 | MT | 61,250.31 | ₹42,997.72 |
| 8.1 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | 25.57 | m2 | 205 | ₹5,240.83 |
| 8.2 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | 28.46 | m2 | 328 | ₹9,336.19 |
| 9.1 | Brick work with 1st class bricks in cement mortar (1:6)
(a) In foundation and plinth | 1.88 | m3 | 4,849.92 | ₹9,132.4 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2556165.xls
BOQ • 0.44 MB
OIDList.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .