| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | ₹11.7 L | L1 | Accepted-AOC Accept |
| Sl No | Description | Qty | Unit | ELAYANAND ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders as per SS20B. | 9 | M3 | 2,034 ₹2,400.12 |
| 2.00 | Supplying and filling in foundation and basement with Crushed Stone Sand (M- Sand) in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 12 | M3 | 3,696 ₹4,361.28 |
| 3.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Course Aggregate) Using 40mm ISS HBG metal including all cost conveyance of materials and labour charges including vibrating charges etc. complete as per standard specification. | 12 | M3 | 64,860 ₹76,534.8 |
| 4.00 | Supplying, fabricating, and placing in position of mild steel for all reinforced cement concrete works including cost and conveyance of steel and binding wire and all other labour charges for cutting bending tying etc, complete as per standard specification. | 880 | M3 | 81,840 ₹96,571.2 |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 11 | M3 | 94,050 ₹1,10,979 |
| 6.00Providing Steel centering and shuttering using 10cm to 15cm dia casurina post and M.S sheet of size 60cm X 90 cm etc., complete as per standard specification | ||||
| 6.01 | Column Beam | 65 | M2 | 79,820 ₹94,187.6 |
| 6.02 | Plinth Beam - | 16 | M2 | 14,720 ₹17,369.6 |
| 7.00 | Brick work in Cement Mortar 1:5 (one cement and five sand) using chamber bricks ground molded of size 23x11x17cm. For the following including curing etc., complete complying with standard specification. For foundation and basement. | 23 | M3 | 1,65,462 ₹1,95,245.16 |
| 8.00 | Supplying and filling of Gravel from approved Quarry including cost and conveyance of materials and labour charges for fillng, levelling, compacting materials etc., complete | 18 | KG | 7,398 ₹8,729.64 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
18 Aug 2025, 3:00 pmClosed
The Commissioner, Tambaram City Municipal Corporat
No.01, Kalaivani Street , Rajakilpakkam , Chennai -73
Construction of Kariya Mandapam Building and Bore well in at Ward No . 22 Tambaram City Municipal Corporation Zone-3
2025_DMA_592299_6
003/2025/E1
Open Tender
Civil Works
90 days
Tambaram City Municipal Corporation
Construction of Kariya Mandapam Building and Bore well in at Ward No . 22 Tambaram City Municipal Corporation Zone-3
2 documents required · 2 mandatory
₹0
₹14,000
30 Jun 2026
13 Aug 2025
18 Aug 2025
13 Aug 2025
18 Aug 2025
13 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid