| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-AOC NO 10 71 VELLALAR STREET PANCHATCHARAM NAGAR CHINNAPANICHERY BHARANIPUTHUR CHENNAI 600 122 | CHENNAI | KANCHIPURAM | TAMIL NADU | 600122 | ₹1.9 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | SAIBABA ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for erection of 25 MVA, 110/33 KV class PowerTransformer with turrets all HV/LV bushings, cable termination box,cooler bank A frame, fans,Pumps,oil pipelines,Marshalling box,Cooler control cubical,RTCC panel and all accessories which ever is necessary for commissioning of the Transformer including crane charges. | 1 | unit | 32,000 ₹32,000 |
| 2.00 | Labour charges (including cost of supply by contractor) for Earthing of Power Transformer tank , Neutral at 2 points, Marshalling Box, DM box,RTCC Panel etc using 65 x 10 mm MS Flat including cost of supply. (approximately KG). | 1 | Unit | 25,000 ₹25,000 |
| 3.00 | Oil filling per liter excess Qty more than 800 Litres. | 3,150 | litr | 0.7 ₹2,205 |
| 4.00 | Provision of filtering machine of appropriate capacity 10/12 KL. | 1 | Per | 7,500 ₹7,500 |
| 5.00 | Labour charges for Hot Oil circulation & filteration upto satisfactory value is achieved. | 15,600 | litr | 2 ₹31,200 |
| 6.00 | Labour charges for termination of control cables in Marshalling box, DM Box,LV Panel, RTCC panel,internal wiring,etc. including the cost of ferrules, lugs and PVC strap etc., | 120 | No. | 22 ₹2,640 |
| 7.00 | Labour charges for internal wiring of power transformer including replacement of existing old cables, laying of new cables, for connecting productive devices like bucholtz relay, PRV, OSR, OTI, WTI, MOG, oil and winding temperature indicator fans, pumps flow meters. | 10 | unit | 1,900 ₹19,000 |
| 8.00 | Labour charges for making panel cutout and mounting of differential relay or any other auxillary relays annunciator, facia type etc in RTCC apnel or other panels using panel cutter | 1 | Unit | 1,200 ₹1,200 |
| 9.00 | Labour charges for providing skilled workmen during transformer bushing CT Testing, Pre commissioning testing and commissioning of the Power transformer. | 3 | No. | 650 ₹1,950 |
| 10.00 | Labour charges for Gland work of control cables including the cost of glands. 19 mm | 4 | No. | 110 ₹440 |
Tender Value
Refer Docs
EMD Value
₹1,930
Closing Date
2 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_624624_1
OT-59/2025-26 of SE/GCC-II
Open Tender
Electrical Works
120 days
Pallikaranai
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1,930
Yes
14 May 2026
19 Nov 2025
3 Dec 2025
19 Nov 2025
2 Dec 2025
19 Nov 2025
Amount
Labour charges for erection of 25 MVA, 110/33 KV class PowerTransformer with turrets all HV/LV bushings, cable termination box,cooler bank A frame, fans,Pumps,oil pipelines,Marshalling box,Cooler control cubical,RTCC panel and all accessories which ever is necessary for commissioning of the Transformer including crane charges.
Labour charges (including cost of supply by contractor) for Earthing of Power Transformer tank , Neutral at 2 points, Marshalling Box, DM box,RTCC Panel etc using 65 x 10 mm MS Flat including cost of supply. (approximately KG).
Oil filling per liter excess Qty more than 800 Litres.
Provision of filtering machine of appropriate capacity 10/12 KL.
Labour charges for Hot Oil circulation & filteration upto satisfactory value is achieved.
Labour charges for termination of control cables in Marshalling box, DM Box,LV Panel, RTCC panel,internal wiring,etc. including the cost of ferrules, lugs and PVC strap etc.,
Labour charges for internal wiring of power transformer including replacement of existing old cables, laying of new cables, for connecting productive devices like bucholtz relay, PRV, OSR, OTI, WTI, MOG, oil and winding temperature indicator fans, pumps flow meters.
Labour charges for making panel cutout and mounting of differential relay or any other auxillary relays annunciator, facia type etc in RTCC apnel or other panels using panel cutter
Labour charges for providing skilled workmen during transformer bushing CT Testing, Pre commissioning testing and commissioning of the Power transformer.
Labour charges for Gland work of control cables including the cost of glands. 19 mm
Labour charges for Gland work of control cables including the cost of glands. 25mm
Labour charges for Gland work of control cables including the cost of glands. 28mm
Labour charges for Gland work of control cables including the cost of glands. 32 mm
(a) Supply and provision of M8,M9,M10,M12, & M16 full thread GI bolt & nuts & washers GI various sizes for wherever required and as dircted by the fIeld Engineer
Labour charges for Erection 75 mm busbars with bends.
Labour and material charges for civil works (LV Frame, cooler fan and radiator frame structure foundation and cooler pipe line support plinth )
Hire charges for transportation of 75mm bus bar and empty Oil drum (upto 100KMs)
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.05 MB
BOQ
BOQ • 0.28 MB
Download all tender documents and submit your bid