Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Eligible |
| 2 | Accepted-Technical | Accepted-Technical Eligible |
| 3 | Accepted-Technical | Accepted-Technical Eligible |
| 4 | Accepted-Technical | Accepted-Technical Eligible |
| 5 | Rejected-Technical | Rejected-Technical Not Eligible |
Tender Value
Refer Docs
EMD Value
₹25,233
Closing Date
10 Aug 2026, 1:00 pmClosed
EE-I,WKED,PWDte.
New Secretariat Building, C Block, 4th floor 1, K.S Roy Road, Kolkata-700001
Operation of Pump Motor sets at different location under Kolkata Lok Bhavan Electrical Sub Division ,P.W.Dte.
2026_WBPWD_5017228_1
WBPWD/EE-WKED/NIQ-48/2026-27
Open Tender
ELECTRICAL WORKS M/R
Item Rate
365 days
Lok Bhavan
Please refer Tender documents.
7 documents required · 7 mandatory
₹25,233
29 Sept 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
10 Aug 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Operation, Monitoring of Pump Motor Sets and Distributing of Sweet and Salt Water in different overhead tanks by operating valves from different Pump Rooms installed at different locations under Kolkata Lok Bhavan Electrical Sub Division everyday including saturday, Sunday & Govt. Holidays as per attached Terms & condition by deputing required number of Semi-Skilled Electrician in the shifts per day as detailed given below for period of twelve months. | |||||
| 1.01 | Charges for providing requisite no. of Semi-Skilled personnel in each every shift per day for 2 nos. shifts per day on all days- [(a) Shift-1 (from 6 a.m. to 2 p.m.)-- 2 nos., (b) Shift-2 (from 2 p.m. to 10 p.m.)--- 2 nos.] (at Pump room) as per attached terms & conditions.
This charges should includes per day minimum wages as per current labour rate of Labour Commissioner, W.B incl. charges for EPF, EDLI & ESI contribution as per relevant Labour Act/Rules and bonus (as per Payment of Bonus Act'1965) as well as service charge considering the cost of supervision charge for engaging valid Supervisor, Profit and other charges against engaging of the said Semi - Skilled Personnel per shift per day.
[Quantity - (365x4) + 120 = 1580 (120 nos shifts of semi-skilled labour will be used as a pump operator in case of different ocassions as and when required) | 1,580 | Per labour per Shift | - | - |
| 2 | Add. G.S.T.@ 18% on total value. | 1 | Item | 100 | ₹100 |
| 3 | Add. LWC.@ 1% on total value | 1 | Item | 100 | ₹100 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
WBF-2911.pdf
Tender Documents • 0.53 MB
Terms_Conditions_48.pdf
Additional Documents • 0.11 MB
BOQ_5087264.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .