| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC JAYANT NEAR JAI HIND SCHOOL LAXMI MARKET SINGRAULI 486890 MADHYA PRADESH INDIA | SINGRAULI | MADHYA PRADESH | 486890 | L1 | Accepted-AOC AWARD OF WORK TO L1 BIDDER AND REJECT L2 AND L3 BIDDER DUE TO NOT L1 BIDDER | |
| 2 | Rejected-Technical | - | Rejected-Technical NOT L1 BIDDER | |
| 3 | Rejected-Technical BUS STAND BINA BINA 231220 UTTAR PRADESH INDIA | BINA | SONBHADRA | UTTAR PRADESH | 231220 | - | Rejected-Technical NOT L1 BIDDER |
Tender Value
₹23.8 L
EMD Value
₹29,800
Closing Date
22 Dec 2023, 11:00 amClosed
GENERAL MANAGER EXCAVATION, NCL KHADIA PROJECT
NCL KHADIA PROJECT, SHAKTINAGAR, SONBHADRA, U.P.
Annual Maintenance Contract (AMC) of Centralised Greasing System (CLS) of 32 Nos. 100Te and 190Te Dumpers and BWS70 KL Water Sprinklers of Khadia Project for a period of 730 days.
2023_NCL_295839_1
KHD/G.M. (Excv)/E-Tender/23-24/932
Open Tender
Excavation Department Work
Item Rate
730 days
NCL KHADIA PROJECT, SHAKTINAGAR
Please refer Tender documents.
5 documents required · 5 mandatory
₹29,800
27 May 2024
11 Dec 2023
23 Dec 2023
11 Dec 2023
22 Dec 2023
12 Dec 2023
11 Dec 2023 - 15 Dec 2023
Amount
Scope of Work/Technical Specifications etc.:- 1. Ensure proper functioning of Central Lubrication System (CLS) under contract with reference to operating pressure, lubricant output and functioning of nozzles / distributers / injectors etc. 2. Cleaning, overhauling and replacement of CLS components and accessories under the contract in case of any malfunctioning /leakages/damages. 3. Rectification/replacement of tubes and hoses related to CLS in case of leakages/damages. 4. Ensure working of all sub parts of lubrication system such as grease pump, Injectors, pressure switch, vent valve assembly and electrical Connection etc. 5. Lubrication of all manual points as per lubrication chart of machine such as output shaft, drive shaft, steering column and fan hub pulley etc. as per schedule. 6. Filling up of grease tank on as and when required basis. 7. Spare parts planning for procurement of spares in advance to keep the CLS in running & reliable condition. 8. Keeping records of individual system /equipment parameters of lubrication system as per OEM recommended check list/ format on daily/ weekly basis. 9. Required tools and tackles shall be provided by the contractor. Other salient features are as follows: a. Grease & all related spares, crane, electricity, welding facility shall be provided departmentally whenever required. c. The job is to be allocated for a period of 730 days (02 Years).
Labour Charges for Annual Maintenance Contract (AMC) of Lubrication System of 32 Nos. 100Te & 190Te Dumpers and BWS70KL Water sprinklers of Khadia Project for a period of 730 days as per scope of work. Note : It includes a Group of 01 No. Skilled Fitter, 01 No. Skilled Electrician and 02 Nos. Un-Skilled Manpower per day for 730 days.
Total impact of GST for the purpose of CTC
M/S DURGA ENTERPRISES
Arvind Refrigeration
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_306404.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .