| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹4.1 L+₹709 (0.17%)Rejected-Finance | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | M RAJKUMAR L1 | R ALAGU L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification.SS20B | 39 | M3 | 184 ₹7,176 Lowest | 185 ₹7,215 |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 10 | M3 | 5,470 ₹54,700 Lowest | 5,471 ₹54,710 |
| 3.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For drain side wall | 209 | M2 | 459 ₹95,931 Lowest | 460 ₹96,140 |
| 4.00 | Supply and Fixing Cuddappa Slab 50m thick(or)Rcc Centering including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers | 8 | M2 | 424 ₹3,392 Lowest | 427 ₹3,416 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 27 | M3 | 6,920 ₹1,86,840 Lowest | 6,922 ₹1,86,894 |
| 6.00 | Plastering with C.M.1:5 (One part of cement and five part of sand) mix using 12 mm thick including cost and conveyance of all materials and labour charges ete., complete complying with standard specifications as directed by the departmental officers | 35 | M2 | 272 ₹9,520 Lowest | 274 ₹9,590 |
| 7.00 | Supplying & fabrication of steel of all RCC work including cost of steel binding wire & labour charge for fabrication & placing in position etc. complete. | 300 | Kgs | 89 ₹26,700 Lowest | 90 ₹27,000 |
| 8.00 | Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 2.5 | M3 | 9,168 ₹22,920 Lowest | 9,169 ₹22,923 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
6 Aug 2025, 3:00 pmClosed
EXECUTIVE OFFICER
SINGAMPUNARI TOWN PANCHAYAT
Construction of Storm water drain with culvert ward no17 theku mela theru in Singampunari Town Panchayat
2025_DTP_587639_1
145-2025-A1
Open Tender
Civil Works
Works
90 days
SINGAMPUNARI TOWN PANCHAYAT
Please Refer Tender Document
3 documents required · 3 mandatory
₹0
₹5,000
Yes
18 Aug 2025
1 Aug 2025
6 Aug 2025
1 Aug 2025
6 Aug 2025
1 Aug 2025
Amount
Earthwork excavation for foundation to the full depth as may be directed by departmental officers in all types of soils except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation with excavated soil in layers of 15cm thick well rammed and consolidated and depositing the surplus earth in the places shown by the departmental officers with initial lead of 10 Meters and initial lift 2 Metres and clearing and leveling the site etc. complete complying with standard specification.SS20B
Plain Cement Concrete 1:4:8 mix (One Cement, Four Fine Aggregate and Eight Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) For drain side wall
Supply and Fixing Cuddappa Slab 50m thick(or)Rcc Centering including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers
Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Plastering with C.M.1:5 (One part of cement and five part of sand) mix using 12 mm thick including cost and conveyance of all materials and labour charges ete., complete complying with standard specifications as directed by the departmental officers
Supplying & fabrication of steel of all RCC work including cost of steel binding wire & labour charge for fabrication & placing in position etc. complete.
Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30)
R ALAGU (BID ID -1420960)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .