| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10 LAccepted-AOC | ₹10 L Quoted ₹11,340 | 1 | Accepted-AOC AOC |
| 2 | 2₹12,036Rejected-Finance | ₹12,036 | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | AISWARYA ASSOCIATES | V V ENTERPRISES |
|---|---|---|---|---|---|
| 1.00Excavation of pole pits | |||||
| 1.01 | For pole upto 8 .00 mt by using JCB. | 1 | EACH | 700 ₹826 | 720 ₹849.60 |
| 1.02 | For pole above 8 .00 mt by using JCB. | 1 | EACH | 725 ₹855.50 | 760 ₹896.80 |
| 1.03 | In Hard soil (Common for all poles) | 1 | EACH | 725 ₹855.50 | 760 ₹896.80 |
| 1.04 | In rocky area (Common to all size of pole ) by using blasting. | 1 | EACH | 750 ₹885 | 760 ₹896.80 |
| 2.00Excavation of Stay pits in hard rock soil | |||||
| 2.01 | Excavation & back filling of stay pit per location -Hard rock requires blasting | 1 | EACH | 735 ₹867.30 | 800 ₹944 |
| 2.02 | Excavation & back filling of stay pit per location -Hard rock requires with out blasting | 1 | EACH | 720 ₹849.60 | 800 ₹944 |
| 2.03 | Excavation & back filling of stay pit per location -medium rock and dense requires blasting | 1 | EACH | 700 ₹826 | 800 ₹944 |
| 3.00Erection of Poles and Accessories | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
22 Oct 2025, 2:00 pmClosed
The Superintending Engineer/CEDC/North/CBE
O/o The Superintending Engineer/CEDC/North/CBE, Tatabad, CBE-12
Works contract for Kovilpalayam sub-division in K.Vadamadurai division
2025_EB_611755_1
Spec No.14/2025-26 dt 06.10.2025
Open Tender
Electrical Works
365 days
Kovilpalayam
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹10,000
22 Dec 2025
6 Oct 2025
23 Oct 2025
6 Oct 2025
22 Oct 2025
6 Oct 2025
6 Oct 2025 - 22 Oct 2025
Excavation of pole pits
For pole upto 8 .00 mt by using JCB.
For pole above 8 .00 mt by using JCB.
In Hard soil (Common for all poles)
In rocky area (Common to all size of pole ) by using blasting.
Excavation of Stay pits in hard rock soil
Excavation & back filling of stay pit per location -Hard rock requires blasting
Excavation & back filling of stay pit per location -Hard rock requires with out blasting
Excavation & back filling of stay pit per location -medium rock and dense requires blasting
Erection of Poles and Accessories
Erection of RCC , REC, PSC poles upto 8.00 m length by using Crane
Erection of RCC , REC, PSC poles above 8.00 m length by using Crane
Erection of metal support above 9m /RSJ/Rail pole/Tubular pole by using Crane
Loading Un loading Charges
Loading of RCC , REC, PSC poles below 8.00 m length by using crane / Manual at Myvadi and M.G.Pudur yard
loading of RCC , REC, PSC poles above 8.00 m length by using crane / Manual at Myvadi and M.G.Pudur yard
Un loading of RCC , REC, PSC poles below 8.00 m length by using crane / Manual at required place
Un loading of RCC , REC, PSC poles above 8.00 m length by using crane / Manual at required place
Transportation Charges
Trasportation of all types and sizes of pole from road side to pole pit
Transportation of DT/Line Materials from store to office / site upto 10 km distance by engaging 1 Ton Capacity Minidor (Lorry)
Transportation of DT/Line Materials from store to office / site above 10 km distance by engaging 1 Ton Capacity Minidor (Lorry)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_730990.xls
BOQ • 0.35 MB
14CBESP.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid