| 1 | 1₹10 LAccepted-AOC | 1 | Accepted-AOC AOC | |
| 2 | 2₹12,036+₹696 (6.14%)Rejected-Finance | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | AISWARYA ASSOCIATES | V V ENTERPRISES |
|---|---|---|---|---|---|
| 1.00Excavation of pole pits | |||||
| 1.01 | For pole upto 8 .00 mt by using JCB. | 1 | EACH | 700 ₹826 Lowest | 720 ₹849.6 |
| 1.02 | For pole above 8 .00 mt by using JCB. | 1 | EACH | 725 ₹855.5 Lowest | 760 ₹896.8 |
| 1.03 | In Hard soil (Common for all poles) | 1 | EACH | 725 ₹855.5 Lowest | 760 ₹896.8 |
| 1.04 | In rocky area (Common to all size of pole ) by using blasting. | 1 | EACH | 750 ₹885 Lowest | 760 ₹896.8 |
| 2.00Excavation of Stay pits in hard rock soil | |||||
| 2.01 | Excavation & back filling of stay pit per location -Hard rock requires blasting | 1 | EACH | 735 ₹867.3 Lowest | 800 ₹944 |
| 2.02 | Excavation & back filling of stay pit per location -Hard rock requires with out blasting | 1 | EACH | 720 ₹849.6 Lowest | 800 ₹944 |
| 2.03 | Excavation & back filling of stay pit per location -medium rock and dense requires blasting | 1 | EACH | 700 ₹826 Lowest | 800 ₹944 |
| 3.00Erection of Poles and Accessories | |||||
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
22 Oct 2025, 2:00 pmClosed
The Superintending Engineer/CEDC/North/CBE
O/o The Superintending Engineer/CEDC/North/CBE, Tatabad, CBE-12
Works contract for Kovilpalayam sub-division in K.Vadamadurai division
2025_EB_611755_1
Spec No.14/2025-26 dt 06.10.2025
Open Tender
Electrical Works
Works
365 days
Kovilpalayam
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹10,000
22 Dec 2025
6 Oct 2025
23 Oct 2025
6 Oct 2025
22 Oct 2025
6 Oct 2025
6 Oct 2025 - 22 Oct 2025
Excavation of pole pits
For pole upto 8 .00 mt by using JCB.
For pole above 8 .00 mt by using JCB.
In Hard soil (Common for all poles)
In rocky area (Common to all size of pole ) by using blasting.
Excavation of Stay pits in hard rock soil
Excavation & back filling of stay pit per location -Hard rock requires blasting
Excavation & back filling of stay pit per location -Hard rock requires with out blasting
Excavation & back filling of stay pit per location -medium rock and dense requires blasting
Erection of Poles and Accessories
Erection of RCC , REC, PSC poles upto 8.00 m length by using Crane
Erection of RCC , REC, PSC poles above 8.00 m length by using Crane
Erection of metal support above 9m /RSJ/Rail pole/Tubular pole by using Crane
Loading Un loading Charges
Loading of RCC , REC, PSC poles below 8.00 m length by using crane / Manual at Myvadi and M.G.Pudur yard
loading of RCC , REC, PSC poles above 8.00 m length by using crane / Manual at Myvadi and M.G.Pudur yard
Un loading of RCC , REC, PSC poles below 8.00 m length by using crane / Manual at required place
Un loading of RCC , REC, PSC poles above 8.00 m length by using crane / Manual at required place
Transportation Charges
Trasportation of all types and sizes of pole from road side to pole pit
Transportation of DT/Line Materials from store to office / site upto 10 km distance by engaging 1 Ton Capacity Minidor (Lorry)
Transportation of DT/Line Materials from store to office / site above 10 km distance by engaging 1 Ton Capacity Minidor (Lorry)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_730990.xls
BOQ • 0.35 MB
14CBESP.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .