Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.3 L+₹2,920.76 (0.55%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹5.5 L
EMD Value
₹6,000
Closing Date
22 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev.) / Project Director
DRDA, Salem
Salem District - Edappadi Block - Infrastructure Facilities tro the Burial Ground in 02 No of Work of - AGAMT - II - 2021-22 Package No.115 /2022-23.
2022_RDTN_239537_189
Roc.No.5182/2021/A16
Open Tender
Civil Works - Others
Item Wise
180 days
DRDA
As per tender document
3 documents required · 3 mandatory
₹0
₹6,000
DRDA, Salem
11 Feb 2023
16 Jul 2022
22 Jul 2022
16 Jul 2022
22 Jul 2022
16 Jul 2022
18 Jul 2022
90 days
Amount
Construction Waiting Shed at Vellarivelli Burial Ground H/O Vellarivelli
Earth work excavation In all soils sub soil to full depth as may be directed except in hard in hard rock requiring blasting but inclusive of shoring strutting sectioning the street to lay Foundation per SS 20 A
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Brick work in cement mortor 1:5 mix Using country bricks 83/4"x43/8"x23/4" and conveyence of all materials to site and all labour charges etc compeltet -10 cum
Collection and supply of gritty gravel including cost nad conveyance of all materials to site and all labour charges etc
Supply and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for RCC column footing staircase steps , bed blocks critical pier etc
Below ground level
Above ground level
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supply and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening cutting to length, beding to shape and tying in position and forming grills for all R.C.C works'
Reinforced cement concrete 1:1:5:3 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc
Plastering with cement mortar 1:5 mix to 12 mm thick including cost and conveyance of all materials to site and all labour charges etc complete
Paving the flooring with special type of flooring tiles ( Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20 mm thick
Painting two coats with Emulsion paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete
Construction of Mini Tank and Extenstion of Pipe Line at Vellarivelli Burial Ground H/O Vellarivelli
Supply and delivery and fixing of 2000 litre HDPE tank as per IS 12701/1996 including loading, unloading transportation and labour charges for fixing of the GI pipes and specials for pipe connection works including cutting, threading and fixing charges etc,,. and all taxes to anywere in Salem District pipes as per BIS standards
construciton of pedsal for the HDPE Tank inBrick Masonry iin CM 1:5 plastering colour washing etc. Complete
Earth work excavation and Deposting on bank with an intial lead of 10 mm & lift of 2m for pipe laying works with standard trench width and depth etc, complete ( other than loose soil)
Supply and delivery of PVC / GI pipes as per BIS standards 63 mm OD 6KSC PVC pipes
Labour charges for laying and Jointing of PVC/GI pipes as per BIG Standards 63 mm OD 6KSC PVC pipes
Refilling the excavated earth as per the standard specifications
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Kannan K
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .