Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC ADD VIKASH BHAWAN ROAD NEAR YADAV MANCH OBERI DISTT BARABANKI | L1 | Accepted-AOC LOWEST QUOTED RATE | |
| 2 | L2₹5.3 L+₹44,573.27 (9.14%)Rejected-Finance | L2 | Rejected-Finance QUOTED RATE GREATER THAN L1 | |
| 3 | Rejected-Technical | - | Rejected-Technical DUE TO TECHNICAL BID NOT QUALIFIED | |
| 4 | Rejected-Technical | - | Rejected-Technical DUE TO TECHNICAL BID NOT QUALIFIED | |
| 5 | Rejected-Technical | - | Rejected-Technical DUE TO TECHNICAL BID NOT QUALIFIED |
Tender Value
₹5.7 L
EMD Value
₹12,000
Closing Date
17 Feb 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER BARABANKI DIVISION SHARDA CANAL
EXECUTIVE ENGINEER BARABANKI DIVISION SHARDA CANAL BARABANKI
EXPANSION OF SLAB AT KM 20.748 AT SAIDANPUR DY.
2023_UPIDC_773190_2
14/EE/2022-23
Open Tender
Civil Works
Item Rate
30 days
BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
₹12,000
16 Mar 2023
11 Feb 2023
17 Feb 2023
11 Feb 2023
17 Feb 2023
11 Feb 2023
Amount
Earthwork in excavation of foundation all type of soil including wet soil all lead and lift with proper disposal as per direction of Engineer -in- charge including cost of material, labour and T&P etc. required for completion of work.
Laying C.C. 1:3:6 in foundation of abutments, wing walls, with cement,coarse sand 10 mm to 20 mm size stone ballast including cost of all material, labour and t&p etc.required for completion of the work.
Class 150 sub class "A" brick work in 1:4 with cement, coarse sand including cost of all material labour and t&p etc.required for completion of the work.
Centering and shuttering for C.C.& RCC work other than buildingincluding cost of all material labour and t&p etc.required for completion of the work.
Cutting bending, binding and placing in position reinforcement steel including cost of all material labour and t&p etc.required for completion of the work..
Laying R.C.C.1:1.5:3 in slab, with cement , course sand & 4.75 to 20mm gauge Kabrai stone grit including cost of all material,labour and T&P etc.required for proper completion of work.
Cement pointing on brick work in 1:2 cm, coarse sand including cost of all material labour and T&P etc. required for completion of work.
Providing and fixing wheel guard stone of rcc (1:2:4) including all cost of matarial ,labour and t&p etc required for completion of work
Supplying and laying joint filler board in expansion joint including cost of all material labour and t&p etc.required for completion of the work.
Finishing walls with premium Acrylic Smooth exterior paint with Silicone additives of required shade . New work ( Two or more coats applied @ 1.43 ltr/ 10sqm over and including priming coat of exterior primer applied @ 2.20 kg/10sqm) (apex Ultima,Weather coat All quard )asian, berger.
Earth work in strengthning both bank up/dn steam including all lead and lift proper dressing and manual compaction as per direction of E-N-C
Neeta Verma
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .