| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.7 LAccepted-AOC | ₹6.7 L | 1 | Accepted-AOC 0.28 percentage Less than the Estimate rate |
| 2 | 1₹6.8 LRejected-Finance | ₹6.8 L | 1 | Rejected-Finance Excess than the Estimate Rate |
| Sl No | Description | Qty | Unit | B Shanmugasundaram H2 | MURUGAN CONTRACTOR H1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Brick work /RandomRubble Masonry including all charges etc complete. | 25 | cum | 280 ₹7,000 Lowest | 300 ₹7,500 |
| 2.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water wherever 'necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed etc.,complete | 36 | cum | 185 ₹6,660 Lowest | 200 ₹7,200 |
| 3.00 | Plain Cement concrete 1:4:8 (one cement, four sand, eight.aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication. | 24 | cum | 5,540 ₹1,32,960 Lowest | 5,560 ₹1,33,440 |
| 4.00 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed below 1mt | 332 | sqm | 460 ₹1,52,720 Lowest | 470 ₹1,56,040 |
| 5.00 | Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 50 | cum | 7,000 ₹3,50,000 Lowest | 7,100 ₹3,55,000 |
| 6.00 | Plastering in CM1:5mix 12mm thick including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete | 80 | sqm | 250 ₹20,000 Lowest | 260 ₹20,800 |
Tender Value
₹8.5 L
EMD Value
₹8,500
Closing Date
29 Aug 2025, 3:00 pmClosed
Executive Officer
67/31 B Main Road Manimutharu, Ambasamudram (TK),Tirunelveli District
Construction of Drainage at Mill Adivaram Essakiamman kovil street ,Chettimedu Indira colony street ,Aladiyur main road ,Melaermalpuram -Chettimedu Main road and Manimutharu School street in Manimutharu Town Panchayat.
2025_DTP_595486_1
249/2025/A1-4
Open Tender
Civil Works - Others
Works
Manimutharu Town Panchayat Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,500
Manimutharu Town Panchayat Office
31 Mar 2026
21 Aug 2025
29 Aug 2025
21 Aug 2025
29 Aug 2025
23 Aug 2025
21 Aug 2025
Amount
Dismantling the damaged Brick work /RandomRubble Masonry including all charges etc complete.
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water wherever 'necessary refilling the sides of foundation with excavated soil other than sand in layers of 15cm thick well rammed and completed etc.,complete
Plain Cement concrete 1:4:8 (one cement, four sand, eight.aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication.
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed below 1mt
Plain Cement Concrete 1:2:4 Mix (one Part of cement, two Part of M- Sand and four Part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Plastering in CM1:5mix 12mm thick including cost and conveyance of all materials to site with all leads of pure water for curing and all labour charges and all other incidental charges etc complete
B Shanmugasundaram (BID ID -1441764)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_711614.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
BOQ_711614.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .