| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 4 6 1 KALABAIRAVANKADU AYAKKARANBULAM II VEDHARANYAM TALUK NAGAPATTINAM DISTRICT 614707 | AYAKKARANBULAM | NAGAPATTINAM | TAMIL NADU | 614707 | ₹1.0 Cr | L1 | Accepted-AOC Least Rate Quoted Bid Accepted |
| 2 | L2₹1.0 Cr+₹92,250.20 (0.91%)Rejected-AOC 609 702 | NAGAPATTINAM | TAMIL NADU | 609702 | ₹1.0 Cr+₹92,250.20 (0.91%) | L2 | Rejected-AOC High Rate Quoted The Bidder Rejected |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
5 May 2023, 3:00 pmClosed
Additional Collectot Dev
DRDA, Collectorate Campus, Nagapattianm
Stregthenning of 1 Road at Keelaiyur Block Package No 11 Under MGSMT Scheme
2023_RDTN_307209_1
MGSMT/Tender/2023/NGT/Pkg-11
Open Tender
Civil Works
Item Rate
90 days
keelaiyur Block
As per the Technical Bid
8 documents required · 8 mandatory
₹0
₹1.0 L
DRDA, Collectorate Campus, Nagapattianm
18 Jul 2023
27 Apr 2023
5 May 2023
27 Apr 2023
5 May 2023
27 Apr 2023
27 Apr 2023 - 28 Apr 2023
28 Apr 2023
Amount
Stregthening of Prathabaramapuram Thatcher Theru Road KM 1/140-3/630 at Keelaiyur Block
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Picking the existing damaged bt surface including all labour cost etc complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively)
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing Gravel soling on side berms of the road using good quality of US Gravel including cost and conveyance of all materials and including all labour charges etc., complete
Provision for painting the centre and edge line with Thermo elastic paint including all labour charges etc complete
Provision for KM Stones
Provision for HM Stones
Provision for Sign Board
Provision for Citizen Information cum Name Board
Provision of rumble strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Construction of Slab culvert (1.50m Span) @ Prathabaramapuram Thatchartheru Road CH: 1158m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc. complete as per standard specification for C.D. works
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
Plain Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works @
Reinforced Cement Concrete 1:1 1/2:3 mix using graded ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for concrete for deck slab concrete @ C.D. works
Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Centering
Provision for Weephole pipes and Craft paper for Deck slab etc conplete
Provision for Expansion Joint Pad for Deck slab etc conplete
Construction of Slab culvert (1.50m Span) @ Prathabaramapuram Thatchartheru Road CH: 2123m
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead and lift including all labour charges and incidental charges such as shoring strutting providing coffer dams baling out water and other item which may be necessary or convenient to the successful completion of the excavation to the bottom of foundation and of back filling in a compacted condition a quantity of materials not exceeding the amount of excavation including all machinery charges for T&P employed etc. complete for foundation as per standard specification for Retaining wall and pipe culverts as per SS20B
Supplying and filling with good river sand including cost and conveyance of sand from approved sources to worksite and stacking the same to departmental metric gauge for taking premeasurement laying layers of not more than 150mm thick watering and tamping with all leads for soft water and including labour charges and all other incidental charges etc. complete as per standard specification for C.D. works
Cement concrete 1:4:8 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Below Sill
Cement concrete 1:3:6 mix using 40mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for foundation concrete for C.D. works Above Sill
Plain Cement concrete 1:2:4 mix using 20mm ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for bed block concrete for C.D. works @
Reinforced Cement Concrete 1:1 1/2:3 mix using graded ISS size HBG metal including all cost and conveyance of materials from approved sources to worksite including cost of cement which will be suplied by the department at the rate and place as specified in the special conditions appended including handling charges for the same cost of form work whenever necessary baling out water labour charges for mixing concrete laying compacting curing with all leads for good water including hire and fuel charges for all T&P employed and all other incidental charges etc. complete complying with standard specification for concrete for deck slab concrete @ C.D. works
Supplying and fabrication to steel Fe 415 (Tor. Steel) required for reinforced cement concrete work including cost and conveyance of steel to work spot handling charges for the rods straightening cutting bending, tying grills using binding wire (No welding should be done to steel item) hoisting placing positioning binding wire, provision of space hard cover blocks necessary stays and supporting devices including labour materials hire charges for all tools and plants employed and all other incidental charges, etc. complete as per standard specification for C.D. works @ Km
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Shuttering
Supply and errecting centering and strutting including necessary supports for plane surface in foudation and basement in all floors for RCC columns, footing pedestals, plinth beam, Critical pier etc., using mild steel angles of size 90 x 60 x 10 cm gauge stiffened welded with mild steel angles of size 25 mm x 25mm x 3 mm for boarding laid over silvr oak joist ( Country wood) of size 10 cm to 6.50 cm spaced at 75 cm centre to centre complete complying with standard specification and as directed as per clause MOST specification.Centering
Provision for Weephole pipes and Craft paper for Deck slab etc conplete
Provision for Expansion Joint Pad for Deck slab etc conplete
1 st year Maintenance
II nd year Manitenence
III rd Year Maintenance
IV th Year Maintenance
Vth year Maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
JEEVE CONSTRUCTION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .