Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹36.5 L (25.4%)Admitted-Finance | ₹1.8 Cr+₹36.5 L (25.4%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹54.0 L (37.6%)Admitted-Finance | ₹2.0 Cr+₹54.0 L (37.6%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical document are not as per requirement |
| 5 | Rejected-Technical | - | - | Rejected-Technical document are not as per requirement |
| Sl No | Description | Qty | Unit | M/S APNATECH CONSULTANCY SERVICES PVT LTD L1 | Ludhiana Agencies (regd.) L2 | HARVITEC ENTERPRISES PVT LTD L3 |
|---|---|---|---|---|---|---|
| 1.00PART-A- Supply of Following materials (All Taxes includs with GST, Insurance, Loading unloading, Carriage, Road tax, etc) | ||||||
| 1.01 | Steel Tubular pole 13 mtr long | 240 | No | - | - | - |
| 1.02 | ACSR Dog Conductor | 20.77 | Km | - | - | - |
| 1.03 | XLPE cable 3x120 mm2 (33KV) | 4.43 | Km | - | - | - |
| 1.04 | 33 KV Jointing Kit 3x120mm2 | 4 | No | - | - | - |
| 1.05 | 33 KV Jointing kit indoor 3x120mm2 | 6 | No | - | - | - |
| 1.06 | GI pipe 6” dia 8 mtr long | 384 | Mtr | - | - | - |
| 1.07 | Gaurding Angle | 194 | No | - | - | - |
| 1.08 | V- type X-arms 100x50x6mm2 ( MS Channel 7.9 kg/m) | 182 | No | - | - | - |
| 1.09 | Holding clamp with nut & bolt | 194 | No | - | - | - |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
6 Jul 2020, 5:00 pmClosed
S.E. E D C- MVVNL,Unnao
S.E.E Distribution Circle Unnao
Construction of 33 K.V. Line from Kundan road to Amrat Payjal Yojna at Village Dewara Kala S.Sirosi Unnao G/s to Executive Officer Nagar Palika Parisad, (Ganga Ghat) Shuklaganj Unnao C/o Project Magaer IV, Nirman Ekai (Elect/mich) UP Jal Nigam, Luckn
2020_MVVNL_485798_1
30/EDC/UNNAO/2020-2021
Open Tender
Miscellaneous Works
Fixed-rate
180 days
Unnao
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹5,900
A/C-No.3355002101008374,IFSC-Code-PUNB0335500,
₹2.1 L
Yes
13 Aug 2020
20 Jun 2020
7 Jul 2020
20 Jun 2020
6 Jul 2020
20 Jun 2020
Amount
PART-A- Supply of Following materials (All Taxes includs with GST, Insurance, Loading unloading, Carriage, Road tax, etc)
Steel Tubular pole 13 mtr long
ACSR Dog Conductor
XLPE cable 3x120 mm2 (33KV)
33 KV Jointing Kit 3x120mm2
33 KV Jointing kit indoor 3x120mm2
GI pipe 6” dia 8 mtr long
Gaurding Angle
V- type X-arms 100x50x6mm2 ( MS Channel 7.9 kg/m)
Holding clamp with nut & bolt
F Bracket for 33 KV
Earth wire clamp
Armaur rod with ferules
Danger board with clamp (33 KV)
GI barbed wire
Allmunium paint (ISI Mark)
Red oxide paint (ISI Mark)
MS Earthing Rod of 20x2500 mm2
GI wire 6 SWG
33 KV pin Insulator
33 KV pin with nut
33 KV Disc Insulator B&S type 7000 kg
33 KV Disc Fitting (dog ) 7000 kg
MS angle from 65x65x6mm2 4300 mm long bracing with clamp
Top channel 125x65mm2 3200 mm2 (10.70 kg/m)
PG Clamps
“E” Bracket for 33 KV
Aluminum Binding wire 6 SWG
Complete stay (GI stay rod 20x1800mm2 Stay wire 7/8 SWG 10 Kg stay clamp bolt & nut with washer
33 KV jointing kit Straight through .
33 KV Insulator
33 KV post Insulator
Part- B Work for Construction of 33 KV line (All taxes are including only GST applicable as per Govt rules)
Erriection of ST Single Pole structure 13 mtr long digging of pits fitting of all accessories along with cartage and dragging from dump site to pits site with fitting of accessories.
Erriection of double pole structure 13 mtr long digging of pits fitting of all accessories along with cartage and dragging from dump site to pit site with fitting of accessories.
Errication of four pole structure 13 mtr long digging of pits fitting of all accessories along with cartage and dragging from dump stie to pit site with fitting of accessories
Fixing of line isolator with structure including all associated works as required .
Fixing of post insulator with 02 nos structure including all associated work as required
Grouting of ST poles as per RESPO Norms with grouting material
Earthing of ST pole as per RESPO Norms
Digging of pits fixing nuzzling of stay rod grouting with materials as ERSPO Norms.
Painting of ST pole with one coat of red oxide and two coat of enamel paint.
Stringing and sagging of 2 wire of 6 SWG GI wire for guarding and making lancing at one meter part in all the span between all support including carriage from dump site to pit site.
Laying stringing and sagging of 3 phase 33 KV line by ACSR dog conductor including all associated works and making clearance of road with joints/ jumpers and binding on insulator as required.
Laying of 33 KV XLPE cable size 3x120mm2 of double cirket under ground as per RESPO Norms
Digging of trunch 1050 mm2 deep 500 mm2 vide including required materials as fine sand Ist class bricks ballast on kachha road (foot path) as per RESPO Norms
Diagging of trunch 1050 mm2 deep 500 mm2 vide including required civil materials (pacca road) as per RESPO Norms.
Making and fixing of 33 KV outdoor/indoor cable jointing kit for 33 KV XLPE cable of size 3x120 mm2 and all associated works as required.
Making fixing of 33 KV strength througth 33 KV XLPE cable of size 3x120 mm2 and all associated works as required.
Hosting of cable on double pole with GI Pipe 6” dia 8 mtr long.
Mounting of CT/PT unit on four pole with fixing of accessories including connection of 33 KV cable from CT/PT unit to metering cubical
Fixing of pilfer proof metering cubical on structure including structure and all associated works as required
Ludhiana Agencies (regd.)
HARVITEC ENTERPRISES PVT LTD
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .