| 1 | L1₹2.2 CrAdmitted-Finance D NO 106C 14TH STREET KEASAVAPURAM NAALUR POST MINJUR 601203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | ₹2.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹17.0 L (7.83%)Admitted-Finance | ₹2.3 Cr+₹17.0 L (7.83%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V P MUNIRAMAN L1 | M.JAYAVEL L2 |
|---|---|---|---|---|---|
| 1.00 | Labour charges for clearing of heavy juliflora jungle with uprooting for facilitating survey including cost of all labour, T&P, lead, lift etc., complete. | 7,020 | m2 | 11 ₹77,220 Lowest | 11 ₹77,220 Lowest |
| 2.00 | Conducting reconnaissance survey with electronic theodolite instrument or electronic distance meter, plotting profile as per standard of TANTRANSCO, report angle points, type of towers, co-ordinates, crossing details, including cost of transport with experienced surveyor and taking levels with Department Engineer for checking the route and angle points and co-ordinates etc., complete as directed by the Department Engineer at site. | 1.17 | Km | 15,000 ₹17,550 Lowest | 21,771 ₹25,472.07 |
| 3.00 | Submission of route map colour print out in 1:50000 scale for route alignment using remote sensing method including cost of all materials, labour, lead, lift etc., complete. | 14 | set | 2,465 ₹34,510 Lowest | 2,662 ₹37,268 |
| 4.00 | Preparation of crossing drawing in AutoCADD and submission of P&T, EHT, railway crossing etc., including cost of all materials, labour, lead, lift etc., complete, as directed. | 28 | set | 3,025 ₹84,700 Lowest | 3,268 ₹91,504 |
| 5.00 | Soil investigation by auger up to the depth of 10m or upto refusal strate where N-value obtained is 50/100 whichever met earlier, conducting penetration test at the change of layer and at specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilisation,demobilisation, shifting from location to location, water charges for drilling, etc., complete. | 2 | Loc. | 75,000 ₹1,50,000 | 74,250 ₹1,48,500 Lowest |
| 6.00 | Conducting check survey, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by the Department Engineer at site. | 4 | Loc. | 2,633 ₹10,532 Lowest | 2,844 ₹11,376 |
| 7.00 | Levelling the site and removing scrub jungle and earth by engaging JCB with lead and lift etc., complete as directed by the Engineer at site. | 40 | Hr | 980 ₹39,200 Lowest | 1,058 ₹42,320 |
| 8.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, T&P, lead, lift, labour etc., complete. | 980 | m3 | 266 ₹2,60,680 Lowest | 287 ₹2,81,260 |
| 9.00 | Installation of stub, cleat and template in position and alignment including cost of all materials, template assembly, shifting the assembly from one location and reassembling in other location, prop setting arrangements, transport, labour, lead, lift etc., complete as directed by the Department Engineer at site.(KCO tower) | 4 | loc. | 50,000 ₹2,00,000 | 46,603 ₹1,86,412 Lowest |
| 10.00 | Supplying and filling with M - sand for foundation including cost of sand, all labour, lead, lift, consolidation, T&P etc., complete. | 18 | m3 | 2,845 ₹51,210 Lowest | 3,072 ₹55,296 |
Tender Value
Refer Docs
EMD Value
₹1.8 L
Closing Date
22 May 2023, 2:30 pmClosed
CE/TP-I/CHN
Guindy 230 KV GIS SS Campus, Chennai - 32
Shifting of existing Sunguvarchatram - Orikkai - Sunguvarchatram - Kanchipuram 110kV DC DCW - Highways
2023_EB_312493_1
TP1-05/2023-24
Open Tender
Civil Works - Others
Works
120 days
Kancheepuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.8 L
8 Jun 2023
8 May 2023
23 May 2023
8 May 2023
22 May 2023
8 May 2023
Amount
Labour charges for clearing of heavy juliflora jungle with uprooting for facilitating survey including cost of all labour, T&P, lead, lift etc., complete.
Conducting reconnaissance survey with electronic theodolite instrument or electronic distance meter, plotting profile as per standard of TANTRANSCO, report angle points, type of towers, co-ordinates, crossing details, including cost of transport with experienced surveyor and taking levels with Department Engineer for checking the route and angle points and co-ordinates etc., complete as directed by the Department Engineer at site.
Submission of route map colour print out in 1:50000 scale for route alignment using remote sensing method including cost of all materials, labour, lead, lift etc., complete.
Preparation of crossing drawing in AutoCADD and submission of P&T, EHT, railway crossing etc., including cost of all materials, labour, lead, lift etc., complete, as directed.
Soil investigation by auger up to the depth of 10m or upto refusal strate where N-value obtained is 50/100 whichever met earlier, conducting penetration test at the change of layer and at specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilisation,demobilisation, shifting from location to location, water charges for drilling, etc., complete.
Conducting check survey, carrying theodolite instrument, measuring span length and pit marking including cost of all men and materials as directed by the Department Engineer at site.
Levelling the site and removing scrub jungle and earth by engaging JCB with lead and lift etc., complete as directed by the Engineer at site.
Earth work excavating and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including cost of all materials, T&P, lead, lift, labour etc., complete.
Installation of stub, cleat and template in position and alignment including cost of all materials, template assembly, shifting the assembly from one location and reassembling in other location, prop setting arrangements, transport, labour, lead, lift etc., complete as directed by the Department Engineer at site.(KCO tower)
Supplying and filling with M - sand for foundation including cost of sand, all labour, lead, lift, consolidation, T&P etc., complete.
Providing Plain cement concrete 1:3:6 using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift, etc., complete.
Providing RCC M30 (minimum cement content 320 kg/cum) using 20mm HBG metal without formwork including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement as directed.
Providing RCC M30 (minimum cement content 320 kg/cum) using 20mm HBG metal with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement as directed.
Supplying, fabricating and placing in position of MS/RTS reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete, as directed.
Bailing out of water by pump set during excavation and concreting using diesel pump 3/5HP with motor including hire charges, cost of diesel, engine oil, labour, transport, lead, lift, etc., complete.
Back filling of pits with excavated earth including watering and consolidation in layers of 150 mm thick and spread balance earth around the location including all T&P, labour, lead, lift etc., complete as directed.
Labour for Supplying and installation of Pipe type earthing for towers to the required length and connecting to tower legs including transport charges, drilling charges, bolts & nuts, washers, cost of all T&P, labour, lead, lift etc., complete, as directed.
Labour charges for erection of towers, tower extensions and special cross arms under LC condition including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, providing one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint and final checking including cost of all materials, labour, lead, lift etc., complete.
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., including cost of paint and all other materials, labour, transport, lead, lift etc., complete, as directed.
Labour charges for hoisting of 7 units of 90KN Ordinary Disc Insulators under LC condition including cost of all suspension fittings, all materials, transport charges, labour, lead, lift, etc., complete, as directed.
Labour charges for hoisting of 8 units of 120KN Ordinary Disc Insulators under LC condition including cost of all tension fittings, all materials, transport charges, labour, lead, lift, etc., complete.
Labour charges for paying out of 6nos. Panther conductor with fittings including sorting out of conductor according to drum shedule, loading and unloading at site, providing trussels, cost of T&P, lead and lift etc., complete as directed.
Labour charges for rough sagging, tensioning, clipping of 6nos. Panther conductor with fittings, providing vibration dampers including giving jumper connections under LC, including cost of all T&P, labour, lead, lift etc., complete (Single span cut point)
Labour charges for rough sagging, tensioning, clipping of 3nos. Panther conductor with fittings, providing vibration dampers including giving jumper connections under LC, including cost of all T&P, labour, lead, lift etc., complete (Single span cut point)
Labour charges for paying out and stringing of 1 no. 7/3.55mm HTGS earthwire with fittings under LC including cost of transporting, sorting out, rolling, providing trussels, paying out, rough sagging, tensioning using tensioner/ puller as per specification, clipping, jumpering, fixing of dampers including cost of all T&Ps, labour, lead, lift etc., complete as directed.
Providing temporary guys with steel wires and turn buckles including necessary earthwork excavation for fixing RSJ/rail bit or concrete blocks for anchorage, dismantling after completion of stringing works including cost of all materials, stay wire, labour, lead and lift etc., complete in all respects as directed.
Arranging and availing shut down, lowering of LT/HT line during stringing work and restringing the same to original position including all labour charges, lead and lift etc., complete in all respects as directed.
Painting tower legs with 2 coats of anti corrosive paint 1m above coping concrete including bracings including cost of paint, all materials, labour, lead, lift etc., complete, as directed.
Supplying and installation of Danger Plate including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Supplying and installation of Number plate including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Supplying and installation of Phase plate (set of Three) including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Supplying and installation of Circuit plate (set of Two) including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Supplying and installation of Name plate including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Supplying and installation of Anti-Climbing device (Set of four) including cost of all T&P, transport, labour, lead, lift etc., complete, as directed.
Plastering with CM 1:3, 12mm thick for smooth finishing including cost of all materials, labour, all lead, lift, curing etc., complete.
Providing shoring and shuttering using necessary country wood planks and scantlings of required size, including cost of all materials, transport, labour, lead, lift etc., complete as directed. (any other improved method is also acceptable to TANTRANSCO, but at no extra cost to TANTRANSCO).
Forming approach road by filling with good quality earth/quarry rubbish over slushy soil including cost of materials, transport charges, all labour, lead and lift etc., complete as directed.
Providing working platform near the proposed tower locations using good quality gravel during execution of work to specified height as directed by the Departmental Engineer at site including cost of all materials, labour, transport, T&P, lead, lift, etc., complete as directed.
Removal of surplus earth away from site to an average distance of 200m by head load and spreading in low lying and other areas as directed by the Engineer at site including cost of all materials, labour, T&P, lead, lift etc., complete.
Labour charges for dismantling the existing towers in as is where is condition without causing damages to tower members under LC condition and devoluting the same to Stores including sorting out of tower parts, transportation, cost of all T&P, materials, labour, lead, lift etc. complete as directed.
Labour charges for releasing and lowering 3nos. Panther conductor under LC condition and devoluting the same to Stores as per direction, including transportation charges, labour, T&P, all lead, lift etc., complete.
Labour charges for releasing and lowering 1no. GI earth wire under LC condition and devoluting the same to Stores as per direction, including transportation charges, labour, T&P, all lead, lift etc., complete.
Labour charges for dismantling and lowering of 7units 90KN suspension insulators with suspension fittings under LC condition and devoluting the same to Stores as per direction, including transportation charges, labour, T&P, all lead, lift etc., complete.
Labour charges for dismantling and lowering of 8nos. 120KN tension insulators with tension fittings under LC condition and devoluting the same to Stores as per direction, including transportation charges, labour, T&P, all lead, lift etc., complete.
Fabrication, Galvanising and supply of GI tower parts including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site
Supply of Hot dip Galvanised GI bolts & Nuts of various size including cost of all materials, labour, lead, lift etc., complete.as directed by the engineer at site
Supply of Single suspension fittings for Panther Conductor as per IS
Supply of Single Tension fittings for Panther Conductor as per IS
Supply of Vibration dampers for Panther Conductor as per IS
Supply of Earth wire tension fitting as per IS
Supply of Aluminium Earth Bond as per IS
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
M.JAYAVEL
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .