Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
Tender Value
Refer Docs
EMD Value
₹87,000
Closing Date
26 Feb 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Misc. Civil works at 132 KV Sub-Station S.G.P.G.I, Lucknow. (Trench, Trench Cover and other misc. civil works.).
2026_UPCTL_1115731_1
116/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
90 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Superintending Engineer, E.C.T.C. Lucknow
₹87,000
28 Mar 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
26 Feb 2026
13 Feb 2026
Misc. Civil works at 132 KV Sub-Station S.G.P.G.I, Lucknow. (Trench, Trench Cover & other misc. civil works.)
Total
Conditions:
All civil work shall be executed according to the approved drawings of UPPTCL.
The quantities in BOQ are tentative and may vary up to any extent or be deleted as per the requirement at site.
All civil work shall be carried out as per UPPWD/UPPTCL specification.
Rates Quoted by the contractor shall be inclusive of all charges/contengencies that amy be encountered at the site.Only GST will be paid extra as applicable.
Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra Tech,Birla or equi.shall only be used.
Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerence shall be measured at actual weight.
Performance Guarantee shall be applicable as per GO 622/23-12-2012-2 Audit/08 dt 08 June 2012.adopted by UPPTCL BOD dated 27.06.2017
The drawing & design including architecture, services , 3D & Elevation shall be provided by the contractor at his own cost and Contractor has to get it approved from the department. Nothing extra shall be payable in this regard.
In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat & 10% as debris. Fresh brick & brick bat shall be issued to contractor/ firm at prevailing/pertaining SOR.
The amount of scrape steel recovered from dismantling shall be shall be issued to contractor/ firm at 1/3rd of rate in prevailing/pertaining SOR.
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.83 MB
Tendernotice_2.pdf
PDF • 0.59 MB
Tendernotice_3.pdf
PDF • 0.82 MB
BOQ_2070716.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .