Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAdmitted-Finance | ₹12.0 L | L1 | Admitted-Finance |
| 2 | L2₹12.9 L+₹89,526.60 (7.47%)Admitted-Finance | ₹12.9 L+₹89,526.60 (7.47%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AUTOMATION HEAVY ELECTRICALS L1 | A.S.ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV MOCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required | 2 | Job | 30,600 ₹36,108 Lowest | 33,300 ₹39,294 |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 2 | Job | 1,20,600 ₹1,42,308 Lowest | 1,24,200 ₹1,46,556 |
| 1.03 | Cleaning of winding with DC 2-26 | 300 | No | 92,880 ₹1,09,598.4 Lowest | 97,200 ₹1,14,696 |
| 1.04 | Replacement of top cover gasket, vertical vent gasket & missing hardware to stop the oil leakage. | 2 | Job | 41,940 ₹49,489.2 Lowest | 49,500 ₹58,410 |
| 1.05 | Replacement of salica gel. | 2 | Job | 5,040 ₹5,947.2 Lowest | 5,940 ₹7,009.2 |
| 1.06 | Repairing of tape changer | 2 | Job | 52,920 ₹62,445.6 Lowest | 54,000 ₹63,720 |
| 1.07 | Repairing of LT Copper bolt and Pam, remetalling and finishing the same as per original shape and size | 8 | Job | 1,54,800 ₹1,82,664 Lowest | 1,58,400 ₹1,86,912 |
| 1.08 | Checking & matching of control wiring of all protection relays and calibration of buchholz relay and protection relays testing the same. | 2 | Job | 28,800 ₹33,984 Lowest | 32,400 ₹38,232 |
| 1.09 | Complete assembling of transformer, cleaning of complete transformer, tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 2 | Job | 54,900 ₹64,782 Lowest | 59,400 ₹70,092 |
| 1.10 | Providing & Fixing of winding protection pad | 2 | Job | 21,600 ₹25,488 Lowest | 22,500 ₹26,550 |
Tender Value
Refer Docs
EMD Value
₹24,200
Closing Date
3 Sept 2026, 3:00 pmClosed
EE SDW IX
RITHALA STP SEC-11 ROHINI DELHI-110085
Servicing, overhauling and dehydration of Bharat Bijlee make 1000 kva Transformers at Rohini Sector 17 SPS.
2026_DJB_297667_1
NITNo2EESDWIX
Open Tender
Miscellaneous Works
Works
60 days
RITHALA STP SEC-11 ROHINI DELHI-110085
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB Sabpisa
₹24,200
9 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Disconnecting of HT supply from main HT panel after proper switching off 11 KV MOCB discharging the supply. Complete drain out of transformer oil from transformer to empty oil drum by oil machine, dismantling of conservator tank all protection relays cable end boxes vent pipes and other items as required | 2 | Job | - | - |
| 1.02 | Cleaning of transformer oil tank and removing of sludge settled in the bottom with the help of vacuum pressure cleaning machine thoroughly, cleaning of core and winding of transformer with hot oil and proper safety precaution to prevent the winding damage as required, cutting of old overheated insulation of winding and re-insulation of weak point with the help of HT insulation material and proper taping etc. | 2 | Job | - | - |
| 1.03 | Cleaning of winding with DC 2-26 | 300 | No | - | - |
| 1.04 | Replacement of top cover gasket, vertical vent gasket & missing hardware to stop the oil leakage. | 2 | Job | - | - |
| 1.05 | Replacement of salica gel. | 2 | Job | - | - |
| 1.06 | Repairing of tape changer | 2 | Job | - | - |
| 1.07 | Repairing of LT Copper bolt and Pam, remetalling and finishing the same as per original shape and size | 8 | Job | - | - |
| 1.08 | Checking & matching of control wiring of all protection relays and calibration of buchholz relay and protection relays testing the same. | 2 | Job | - | - |
| 1.09 | Complete assembling of transformer, cleaning of complete transformer, tightening of all connection of incoming and outgoing side and testing & checking of IR test with megger of winding & cable of both sides with HI pot machine. | 2 | Job | - | - |
| 1.1 | Providing & Fixing of winding protection pad | 2 | Job | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_396608.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .